Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />pay and the ENGINEER agrees to accept fees as specified in sections <br />I <br />following as full and final compensation for work accomplished. <br /> <br />ARTICLE 2 <br />ENGINEER'S SERVICES <br /> <br />2.1 BASIC SERVICES <br /> <br />2.1.1 The ENGINEER agrees to perform professional services in <br /> <br />connection with the PROJECT as hereinafter stated, including the stipu- <br /> <br />lations within the Agreement. <br /> <br />2.1.2 <br /> <br />The ENGINEER shall render services necessary for deve1op- <br /> <br />ment of the PROJECT into four phases as follows: <br /> <br />PHASE 1 - Preliminary engineering studies, investigations, <br /> <br />design concept of improvements and preliminary <br /> <br />report; <br /> <br />PHASE 2 - Final design and preparation of detailed con- <br /> <br />tract drawings and specifications; <br /> <br />PHASE 3 - Administration of the Contract - Construction <br /> <br />Phase; and when requested; <br />PHASE 4 - Resident Project Representativel during construc- <br />tion. <br /> <br />2.2 PHASE 1, PRELIMINARY <br /> <br />During Phase 1, the ENGINEER shall: <br />2.2.1 Prepare a preliminary and final progress chart of the <br />professional engineering services to be rendered with estimated dates of <br /> <br />completion of the various phases. <br /> <br />2.2.2 Attend conferences with the OWNER and other interested <br /> <br />parties regarding the PROJECT. <br /> <br />-3- <br />