CITY OF ift 41,41 'COS
<br />TABULATION SHr ET
<br />ITEM Wastewater Extension DATE-4/7/76 2:00 P.M.
<br />IH 35 South To Civic Center
<br />J
<br />Bidders Calendar
<br />Bid Bond Days
<br />Base Bid
<br />Alternate # 1 Add.
<br />Alternate 2
<br />Ad Alt Total
<br />_
<br />C.M. Construction C Present 90 65,012.9 Negative $ 7,319.6 $ 8,187.00 $ 2,834.1 $ 68,714.4
<br />:Vew"Braurife s,
<br />Cullum &Dickehut
<br />Construd tion-Co.
<br />Karble Falls TX ,_
<br />
<br />Present
<br />
<br />90 -
<br />
<br />8,200-00 -
<br />
<br />1,618.5 -
<br />
<br />7 A, 22-23--7 D
<br />
<br />Du-Mor Enterprixes
<br />Sari Antonio, exas Present 69,489.6 Negative 4,430.5 8,272.00 3,913.0 77,244.0
<br />
<br />I
<br />c
<br />C
<br />J
<br />n
<br />ones
<br />o.,
<br />R.L.
<br />San Antonio, Texas
<br />Present
<br />-
<br />67,947.6
<br />Negative
<br />3,131.1
<br />8,234.00 _-_--_---
<br />4,253.0
<br />77,303.4
<br />
<br />Underground Utl_liti
<br />Texas
<br />AuH in, s
<br />Present
<br />75,750.0
<br />Ne ative
<br />9,607..75
<br />8L,935,00
<br />-
<br />- 3,963.7
<br />7 .041
<br />-_ _ _
<br />Capitol City Utiliti es
<br />Austin. Texas Present 120 20.00 4,520.0 85,669.95
<br />
<br />Bland Construction --- - -
<br />- ?0'
<br />.B1.L?t 1I1 Texas _- Present
<br />_ 150
<br />- - _84_,_031.Q Positive 761.0
<br />
<br />-
<br />--
<br />- 11 255.00 5,148.7 101,195.8
<br />--
<br />-------- --------
<br />M.H. Braden Enterer ---------
<br />ses -- - - -- __
<br />i
<br />-
<br />-
<br />San Antonio, TX Present _
<br />- __ 89,522.1 Negative 4,936.6 _ __ 11,461.00 5,268.7 0
<br />3
<br />
<br />ineering
<br />Austin En -- _ -__-- ---- - -------- --
<br />-
<br />g
<br />-Co
<br />?
<br />ti?
<br />exas 7
<br />Z5
<br />S
<br />- _ i___-___ __-,
<br />88,926.Q _
<br />oai -iy
<br />10.8$S.QI)
<br />_
<br />-_445-_Q
<br />.19A 443_6
<br />_
<br />,
<br />_
<br />_
<br />G.P. Falbo ---
<br />San Antonio, TX Present - 120 T 141,625.0 Negative 47,339.5 9,600.00 _ 7,150.0 111 X035_.5
<br />
<br /> gn L-9-5-61 4--0 Q
|