My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 1972-045
San-Marcos
>
City Clerk
>
02 Ordinances
>
1970 s
>
1972
>
Ord 1972-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2008 2:28:39 PM
Creation date
9/3/2008 2:28:39 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
Number
1972-45
Date
12/19/1972
Volume Book
40
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Form No .948 <br />EX H 1 BIT A <br /> <br />W.iER COLORADO RIVER AUTHORITY <br />STAN'JAF.D !.UNICIPAL POWEH RATE <br />SCHEDULE A-3 <br /> <br />Ava.ilaME t;i <br /> <br />Thls schedule ls avaHahle to lncorporated municipaHties under written contract <br />for electric power for full power requirements for the operation of pumping and <br />compressing equipment of municipally-owned and operated water supply systems, <br />sewage disposal systems and artificial gas plants. <br /> <br />Character of Service <br /> <br />I <br /> <br />Alternating current, single or three-phase, 60 cycles. Voltage supplied will be <br />determined by the voltage available from distribution lines in the vicinity and/or <br />other conditions. <br /> <br />Rate <br /> <br />The rate for this service consists of two parts as follows: <br /> <br />1. Investment Charge <br /> <br />The annual investment charge shall be 12)1, (including operation, maintenance, <br />depreciation and return on investment) applied to the investment determined <br />as set forth below. This charge will 'be recomputed on July I of each year <br />and 1/12 of the total annual charge so computed will be billed customer monthly. <br /> <br />2. Energy Charge <br /> <br />One cent per Kwh for all el'\ergy used. <br /> <br />Terms of Payment <br /> <br />Above rate is net, the gross rate being ten per. cent (10%) hi@1er. In the event <br />the current 'monthly bill is not paid within ten (10) days from date of bill, the <br />gross rate shall apply. <br /> <br />I <br /> <br />Primary Metering <br /> <br />The above rate is based upon the supply of service to the entire premises at <br />primary voltage. In case the service is metered on the low side, the kilowatt <br />hours measured shall, for billing purposes, be increased two per cent (2%) to <br />cover transformation losses. <br /> <br />Single Voltage <br /> <br />Service shall be delivered to the entire premises through a single delivery and <br />metering point, and at a single voltage. In case more than one voltage is re- <br />quired, customer shall provide all additional transformation facilities necessary <br />to 'obtain the additional voltage. Lighting service, if separately metered, shall <br />be billed on the regular published rate applicable to the service. <br /> <br />. Method of Determining Authority's Investment <br /> <br />The investment in property and equipment used as a basiS for the investment <br />.charge contained in this schedule shall consist of .the cost of the facilities <br />devoted exclusively by the Authority to service rendered under this schedule. <br />If funds used in financing the cost of any part of such facilities have been <br />received as contributions a deduction shall be made from the annual investment <br />charge in the amount of six per cent (6%) of the total of such funds. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.