Laserfiche WebLink
<br /># <br /> <br />I <br /> <br />I <br /> <br />. <br /> <br />Schedule B-4 <br />Page 2 of 2 <br /> <br />Relocation of Lamps <br /> <br />Distributor shall, at request of Customer, relocate or change <br />existing equipment, Customer shall reimburse Distributor for euch changee <br />at actual cost, including appropriate overheads. <br /> <br />Meterinp; <br /> <br />All energy consumed under this schedule shall be metered excepting <br />installatione where, in the opinion of Distributor, metering would be <br />impracticable. . <br /> <br />When the consUlD;ption is metered, the meters shall be installed in or <br />connected to the lighting circuit and the billing shall include the energy <br />delivered to and consumed and all circuits and equipment used exclusively <br />for street lighting purposes. If more than one meter is used, the readings <br />shall be consolidated for billing purposes. <br /> <br />When the energy is not metered and also when a meter is found to be in <br />error, the consumption for billing purposes shall be computed from the rated <br />capacity of the lamps plus 5'1> for losses, multiplied by the number of hours <br />of use. <br /> <br />Payment <br /> <br />The rates included herein are net, the gross rates being ten per cent <br />(lo'f,) higher. In the event the current monthly bill is not paid within ten <br />(10) days from date of bill, the gross rates shall apply. <br /> <br />50 copies <br />l/1l~/52 <br />km <br />