My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06152010 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2010
>
06152010 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2017 4:05:43 PM
Creation date
6/18/2010 3:56:36 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
6/15/2010
Volume Book
186
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Rodney Cobb, Director of Community Services, reported on mowing along IH -35. TXDOT has <br />reduced the frequency of mowing due to funding. • <br />Rick Menchaca, City Manager, reported on the McCarty Lane construction. We are progressing <br />on the construction, including the right -of -way clearance. Over 1,000 feet of waterline has been <br />constructed. Phase 3 is currently under construction. The county has contributed $2.3 million to <br />our total project cost. The City portion is $9 million. We will come in 30% under budget. <br />There were some questions if this would jeopardize the County's pass through funding. We <br />received a letter from TXDOT that it does not. We also asked if this will jeopardize the pass <br />through toll rate. We were told this also will not be jeopardized. The County and City will <br />prepare a joint response. <br />David Healey, Director of CIP, reported there are currently 65 projects under way with 55 <br />companies engaged. There are 9 projects under construction. Upcoming completion milestones <br />include: July 17 : Central Fire Station Ribbon Cutting; July 24 : Wonder World Drive Extension <br />Dedication; August: Airport Control Tower Open; and September Five Mile Dam Park & <br />Soccer Fields Open. 2010 completed projects include: Comanche Wastewater Improvements; <br />Guadalupe Sidewalks; Sessom Drive Phase 1; Sink Creek Wastewater Interceptor Phase 1, <br />WWTP Wet Weather Improvements; and MKT 12" Wastewater. Current projects are McCarty <br />Lane; Rio Vista Terrace Phase 2; Five Mile Dam Phase 2; and Airport Control Tower. Projects <br />on the horizon include: <br />• Rail Road Quiet Zones <br />• HNTB will be under contract to expedite a quiet zone project that covers the <br />entire city <br />• Almost 40 crossings <br />• Working closely with FRA, TXDOT, Texas State, UPRR <br />• Victory Gardens Drainage Channel Improvements <br />■ Public meeting June 16, Dunbar Center, 6 p.m. <br />• Downtown Two -Way Conversion <br />• Study includes Hutchison & LBJ <br />• Public meeting June 30, Fish Hatchery, 6 p.m. <br />CONSENT AGENDA <br />10. Consider approval of minutes. <br />A. June 1, 2010 Regular Meeting <br />B. June 4, 2010 Special Meeting <br />11. Consider adoption on second and final readi of Ordinance 2010 -31, amending the <br />traffic register maintained under Section 82.067 of the San Marcos City Code by amending <br />the speed limit of a section of Wonder World Drive (F.M. 3407) in both directions from <br />F.M. 2439 (STA 185 +85.0) to a point west of the R.M 12 intersection (STA 19 +28.28): and <br />including procedural provisions. <br />• <br />RM061510 Minutes Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.