1.3.8 Evaluate existing sidewalks and provide recommendations for improvements to the <br />sidewalks in compliance with ADA/TAS requirements. <br />1.3.9 Evaluate and provide recommendation for replacing and sizing of the water lines. <br />1.3.10 Evaluate and provide recommendation for waterline crossings at IH 35 and at Railroad. <br />1.3.11 Evaluate and provide recommendation for replacing of the sanitary sewer lines: <br />a) Investigate open cut option <br />b) Investigate pipe bursting option. <br />1.3.12 Evaluate and provide recommendation for replacing the Roosevelt Wastewater line: <br />a) Investigate open cut option <br />b) Investigate pipe bursting option. <br />1.3.13 Identify the right of way acquisition needs associated with the street and drainage <br />improvement project. Identify corner clips and other right-of-way requirements needed to <br />accommodate proposed improvements at intersections, and other areas. <br />1.3.14 Prepare the preliminary plan drawings for inclusion in the PDR. <br />1.3.15 Prepare profile drawing of drainage channel improvements for the inclusion in the PDR. <br />1.3.16 Provide preliminary utility coordination to include: <br />a) Identification of utility companies from visual markers and request as-builts from <br />utility providers to locate utilities; <br />b) Identification of potential conflicts during preliminary design; and <br />c) Hold one (1) utility meeting with utilities to occur at the PDR submission. At this <br />meeting the Engineer will inform utility providers of the Project and what impact the <br />Project may have on the utility lines. <br />1.3.17 Provide a preliminary engineering report to include: <br />a) A preliminary cost estimate using approved roadway design criteria and average low <br />bid unit prices. The Engineer will separate the estimate into each improvement for <br />estimation and planning purposes. <br />b) Prepare the final PDR summarizing the findings of the preliminary design phase to <br />include recommendations and the final design parameters that will be necessary to <br />begin the next phase of design. The Engineer will prepare five (5) draft version of the <br />final report for City review and approval. After incorporating City comments, the <br />Engineer will prepare five (5) copies of the final version of the PDR outlining the <br />approach for design phase. <br />Bain Medina Bain - Victory Gardens Agreement