Laserfiche WebLink
decision on the award of the construction contract and the acceptance or rejection of bids. The <br />Engineer will provide technical (but not legal) advice in bid protest situations. It is assumed that <br />this Project will be bid as one Project and neither party anticipates that it will be necessary to re- <br />bid the Project. <br />1.5 TASK 5 -CONSTRUCTION PHASE <br />Through the construction phase of each Project as assigned, the Engineer will ensure that <br />all outstanding problems are resolved and a smooth operation start-up is achieved as follows: <br />1.5.1 Coordinate with the Project Engineer on its review of the Contractor's preliminary <br />submittals including the detailed critical path schedule. <br />1.5.2 Conduct a pre-construction conference with the Project Engineer on behalf of the City. <br />1.5.3 Review project administration procedures with the Contractor. <br />1.5.4 Provide periodic construction observation. <br />1.5.5 Attend construction meetings, and review minutes prepared by the Project Engineer for <br />each meeting. <br />1.5.6 Provide comments as necessary to the Project Engineer on shop drawings. <br />1.5.7 Monitor the Project's progress, and budget compliance through the duration of the <br />Project. <br />1.5.8 Review with the Project Engineer monthly payment applications and progress schedules. <br />1.5.9 Review the Project Engineer and the City's responses to Contractor's Requests for <br />Information ("RFI"). <br />1.5.10 Evaluate Change Order applications or any other claims with the Project Engineer and <br />make recommendations to the City regarding the resolution of any outstanding issues. <br />1.5.11 Attend a walk-through at final and substantial completion milestones with the Project <br />Engineer. <br />1.5.12 Review and comment on the Project punch list as prepared by the Project Engineer. <br />1.5.13 Coordinate with the Project Engineer the close-out documentation for the Project. <br />1.5.14 Review the certificate of final completion prepared by the Project Engineer for the <br />Project in coordination with the City. <br />Bain Medina Bain Project Management <br />4