Laserfiche WebLink
Attachment "A" <br />The City of San Marcos <br />BREAKER addition at Canyon Substation <br />Scope of Services - Engineering, Materials, and Construction <br />B. LCRA Materials personnel will procure by direct purchase, or issue materials out of <br />Austin Stores as noted on the engineering material list(s). Materials will be <br />purchased using accepted practices, <br />accepted and approved vendors, and will be expedited to meet the requirements of <br />the construction schedule. <br />4. Construction <br />A. LCRA Transmission Substation Construction crews will install the new breaker <br />foundations, conduit, cable and panels as prescribed in the approved for <br />construction plans. <br />Page 2 of 2 <br />Prepared by M. Moore <br />L O W E R C O L O R A D O R I V E R A U T H O R I T Y