Laserfiche WebLink
9.1 Detention of stormwater on the site may be waived, partially or in full, subject to • <br />submission of technical justifications and approval of the Engineering Director. <br />This project reserves the ability to participate in a stormwater detention fee-in-lieu <br />program, should one become available prior to site development. <br />9.2 Water quality for the proposed site will be provided by a Partial <br />Sedimentation/Filtration Pond which will remove approximately 85% of the <br />on-site pollutant load which exceeds the current City of San Marcos requirements. <br />This project reserves the ability to participate in a water quality treatment fee-in- <br />lieu program, should one become available prior to site development. <br />10.0 IMPERVIOUS COVER. <br />10.1 A maximum of 90% impervious cover is permitted. <br />10.2 Allowable impervious cover will be 90% of the total site area of 2.712 acres. <br />Property dedicated or reserved for ROW will not be included in the impervious <br />cover calculation. Sidewalks and paved parking adjacent to public ROW will not <br />count toward the total site impervious cover. <br />11.0 HEIGHT. <br />11.1 The building height will be calculated from existing grade to the roof deck • <br />(or mean height of a pitched roof) of the adjacent elevation (see site development <br />standards chart for further explanation). Parapets, stair/elevator towers, <br />decorative elements, ornamental towers, etc. will be exempt from the height <br />calculation. Building height will not exceed 80 feet. Exhibit S includes exhibits <br />demonstrating the building heights relative to the site grade and surrounding <br />development. <br />12.0 PLATTING. <br />12.0 The property will be platted as a single lot and will meet the Land Development <br />Code subdivision requirements except that ROW dedication will be consistent <br />with Section 7.4 of this document. <br />13.0 GREEN BUILDING. <br />13.1 The project will apply for Leadership in Energy and Environmental Design <br />(LEED) Certification for New Construction (NC). LEED-NC certification is not <br />granted until construction completion but will be actively pursued by the owner <br />and design team. Certification criteria will be based upon the U.S. Green building <br />Council's Green building rating system for new construction or major <br />rehabilitation in place at the time of site development. <br />14.0 REVISIONS AND VARIANCES TO THE PDD AND CONCEPT PLAN. •