Laserfiche WebLink
• <br />2) The area of attached signs is limited <br />according to the land use of the premises. <br />The allowances may be increased by up to <br />fifty (50) percent when the premises will <br />have no freestanding signs. <br />a) Multi-family residential uses may have <br />identification signs having a total <br />aggregate area of up to five (5) percent of <br />the area of the fagade on which they are <br />located (CEVM signs prohibited). <br />On-Premises Freestanding Signs: <br />1) The number of permanent on-premises <br />signs is limited to one per street frontage. <br />2) Maximum height of any on-premise sign <br />shall not exceed 25 feet. Lots/businesses <br />with street frontage in excess of 400 linear <br />feet may have one additional <br />ground/monument sign per street frontage. <br />Ground/monument signs shall not exceed <br />seven (7) feet in height. <br />3) Maximum sign area per sign shall not <br />exceed 120 square feet or 80 square feet <br />for ground/monument signs. <br />• <br />9.0 Environmental Protection <br />Code PDD <br />Detention: <br />City of San Marcos detention standards require on- Detention of stormwater on the site may be waived, <br />site detention. partially or in full, subject to submission of <br /> technical justifications and approval of the <br /> Engineering Director. This project reserves the <br /> ability to participate in a stormwater detention fee- <br /> in-lieu program, should one become available prior <br /> to site development. <br />Water Quality: Upgraded water quality is proposed based on a <br />City of San Marcos water quality standards require capture of the first 0.5-inch of runoff plus an <br />detention of the 2-year storm event with pollutant additional 0.1-inch for each 10% increase of gross <br />removal efficiencies of approximately 70%. impervious cover over 20%. This will result in <br /> approximately 85% of pollutant removal during the <br /> 2-year storm event. This project reserves the ability <br /> to participate in a water quality treatment fee-in-lieu <br /> program, should one become available prior to site <br /> development. <br />10.0 Impervious Cover <br />Code PDD <br />• MF permitted: 75% Maximum allowable impervious cover is 90%. <br />-8-