My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11032008 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2000 s
>
2008
>
11032008 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2017 4:37:34 PM
Creation date
12/5/2008 8:31:48 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
11/3/2008
Volume Book
178
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f,. <br />4. Final construction cost estimate to include unit costs at current construction <br />dollars. <br />5. Technical specifications in MasterSpec Format. <br />BIDDING — After completion and approval of the Construction Documents, the <br />Landscape Architect will provide the Client with stamped reproducible drawings for <br />inclusion in the project pricing. <br />CONSTRUCTION ADMINISTRATION - The Landscape Architect will provide <br />Construction Administration for the project on an hourly basis, as requested. <br />FEE - The total fee for this project is a lump sum based upon the estimated time for <br />professional services plus reimbursable expenses. <br />Design Development $5,750.00 <br />Construction Documents $11,250.00 <br />Bidding $500.00 <br />Construction Administration Hourly <br />TOTAL $17,500.00 <br />We consider Additional Services to include changes made after a phase of work has <br />been accepted and we have been authorized by the Client to proceed to the next <br />phase. <br />REIMBURSABLE EXPENSES - The Client shall pay the Landscape Architect for the <br />cost of out of town travel expenses, mileage, printing, and other directly related costs. <br />All expenses will be billed at cost plus 15 %. <br />EXTRA SERVICES - Additional services, if requested by the Client, will be considered <br />as extra services and be billed hourly at the rates listed below. <br />Principal <br />$150.00 /hou r <br />Senior Associate <br />$115.00 /hou r <br />Project Manager <br />$100.00 /hou r <br />Assistant Project Manager <br />$75.00 /hour <br />Project Staff <br />$65.00 /hour <br />Administrative <br />$55.00 /hou r <br />EXCLUSIONS TO THE CONTRACT <br />I. Topographic and boundary surveys. <br />2. Existing site engineering and utility base information. <br />3. Soil engineering, geotechnical consultant services or related testing, if required. <br />4. Structural engineering. <br />
The URL can be used to link to this page
Your browser does not support the video tag.