My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-006
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2009 8:53:01 AM
Creation date
1/7/2009 11:08:47 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-6
Date
1/6/2009
Volume Book
179
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Schedule of Services and Fees <br />Geotechnical Engineering Services <br />Effective January 1, 2008 <br />ENGINEERING <br />Engineering and technical services for preliminary reconnaissance, boring layout, delayed water levels, backfilling of borings, evaluation, field <br />supervision, analysis, recommendations, reporting and consultation: <br />Chief Engineer ................................................................................................................... ................ Per Hour ...................................... ........................... $ 180.00 <br />Regional Engineer ............................................................................................................. ................ Per Hour ...................................... ........................... $ 160.00 <br />Senior Engineer ................................................................................................................. ................ Per Hour ...................................... ........................... $ 125.00 <br />Project Engineer/Manager ................................................................................................ ................ Per Hour ...................................... ........................... $ 100.00 <br />Graduate Engineer ............................................................................................................ ................ Per Hour ...................................... ........................... $ 90.00 <br />Clerical ............................................................................................................................... ................ Per Hour ...................................... ........................... $ 45.00 <br />CAD Services .................................................................................................................... ................ Per Hour ...................................... ........................... $ 55.00 <br />A transportation charge of $0.42/mile and per diem charge of $60.00/man/day will be added, if applicable. <br />DRILLING <br />Mobilization and moving of drilling equipment on and off site each way: Per Mile ....................................... ........................... $ 5.50 <br /> Per Minimum .............................. ........................... $ 450.00 <br />Auger drilling without sampling: <br />Depth, Feet <br />0-25 ........................................................................................................................................... <br />25-50 ......................................................................................................................................... <br />50-100 ...................................................................................................................................... <br />100+ .......................................................................................................................................... <br />Soil sampling as required with split-barrel or thin wall tube (Shelby Tube) sampler: <br />Depth, Feet <br />0-25 ........................................................................................................................................... <br />25-50 ......................................................................................................................................... <br />50-100 .......................................... .................................................................................. <br />100+ .......................................................................................................................................... <br />Additional Charge for Special Equipment or Expendable Supplies: <br />All terrain vehicle mounted drill rig ....................................................................................... <br />'Mobilize all terrain vehicle to site ......................................................................................... <br />*Air compressor, hoses, filters, fuel ....................................................................................... <br />(utilized for rock core drilling) <br />Special and/or insitu testing: <br />Dennison or Piston Sampler ............................................................................................... <br />Other insitu testing with special equipment ....................................................................... <br />Cost of special equipment or permits for moving <br />drilling equipment about the site ............................................................................................ <br />LABORATORY TESTING <br />Visual Classification .......................................................................................................................... <br />Moisture content tests ........................................................................................................................ <br />Density determinations ...................................................................................................................... <br />Unconfined compression tests w/o stress versus strain curve ......................................................... <br />Atterberg limits determination .......................................................................................................... <br />Percent swell tests .............................................................................................................................. <br />Swell pressure tests ............................................................................................................................ <br />Permeability testing, Falling or Constant Head ............................................................................... <br />Grain size analysis, mechanical ........................................................................................................ <br />Percent passing #200 sieve ................................................................................................................ <br />Consolidation ..................................................................................................................................... <br />Triaxial shear testing <br />a. Unconsolidated-undrained ................................................................................................. <br />b. Consolidated-undrained ..................................................................................................... <br />c. Consolidated-drained ......................................................................................................... <br />Moisture-density relationship <br />a ASTM D698 (Standard Proctor) ....................................................................................... <br />b. ASTM D1557 (Modified Proctor) .................................................................................... <br />c. TEX 113E ........................................................................................................................... <br />California Bearing Ratio w/o moisture-density relationship .......................................................... <br />Soil Drilling Rock Coring <br />Per Linear Foot ................... ...... $ 16.00 $ 21.00 <br />Per Linear Foot ................... ...... $ 21.00 $ 25.00 <br />Per Linear Foot ................... ...... $ 25.00 $ 31.00 <br />Quoted Upon Request <br />Per Sample ........................... .............................. .... $ 10.00 <br />Per Sample ........................... .............................. .... $ 12.00 <br />Per Sample ........................... .............................. .... $ 20.00 <br />Quoted Upon Request <br />Per Day ................................................................... $1380.00 <br />Per Mile .................................................................. $ 5.30 <br />Cost Plus 15% <br />Each ........................................................................ $ 75.00 <br />Quoted Upon Request <br />At Cost Plus 15% <br />Each ..................................... ................................... $ 5.00 <br />Each ..................................... ................................... $ 5.00 <br />Each ..................................... ................................... $ 25.00 <br />Each ..................................... ................................... $ 25.00 <br />Each ..................................... ................................... $ 65.00 <br />Each ..................................... ................................... $ 125.00 <br />Each ..................................... ................................... $ 175.00 <br />Each ..................................... ................................... $ 225.00 <br />Each ..................................... ................................... $ 95.00 <br />Each ..................................... ................................... $ 60.00 <br />Each ..................................... ................................... $ 375.00 <br />Per Point ................................................................. $ 120.00 <br />Per Point ................................................................. $ 350.00 <br />Per Point ................................................................. $ 350.00 <br />Each ........................................................................ $ 195.00 <br />Each ........................................................................ $ 195.00 <br />Each ........................................................................ $ 185.00 <br />Each ........................................................................ $ 275.00 <br />6
The URL can be used to link to this page
Your browser does not support the video tag.