My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2001-006
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2002
>
Res 2001-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2007 3:28:04 PM
Creation date
10/11/2005 3:41:37 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
Number
2001-06
Date
1/14/2002
Volume Book
146
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE6A <br />Planning Horizon Milestone Summary <br />San Marcos Municipal Airport <br /> I Short Intermediate Long <br /> I 2000 Term Term Term <br />ANNUAL OPERATIONS <br />Itinerant <br />Air Taxi 276 300 500 1,000 <br />General Aviation 36,800 50,000 56,000 75,000 <br />Military 2,000 3,000 4.000 5,000 <br />Total Itinerant 39,076 53,300 60,500 81,000 <br />Local <br />General Aviation 64,400 75,000 84,000 112,500 <br />Military 0 1,000 1.000 1.000 <br />Total Local 64,40D 76,000 85,000 113,500 <br />Total Operations 103,476 129,300 145,500 194,500 <br />BASED AIRCRAFT <br />Single Engine 189 200 217 285 <br />Multi-Engine 10 13 17 26 <br />Turboprop 22 28 34 45 <br />Jet 4 6 8 11 <br />Helicopter 2 3 4 8 <br />Total Based Aircraft 227 250 280 375 <br />Total AIA's N/A 1,050 1,150 1,370 <br /> <br />The short term planning horizon <br />contains items of high priority, and <br />those that should be considered as the <br />airport begins to approach the <br />milestones identified for the short term. <br /> <br />As short term horizon activity levels are <br />reached, it will be time to program for <br />the intermediate term based upon the <br />next activity milestones. Similarly, <br />when the intermediate term milestones <br />are reached, it will be time to program <br />for the long term activity milestones. <br /> <br />As a master plan is a conceptual <br />document, implementation of these <br />capital projects should only be <br />undertaken after further refinement of <br />their design and costs through <br />architectural and engineering analyses. <br /> <br />The cost estimates presented in this <br />chapter have been increased to allow for <br />engineering any other contingencies <br />that may arise on the project. Capital <br />costs presented here should be viewed <br />only as estimates subject to further <br /> <br />6-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.