Laserfiche WebLink
<br />of the sewer and drainage systems at <br />San Marcos. Initial findings indicate <br />that the existing system is serviceable <br />but in the need of repairs. Capital <br />improvement projects, to be presented <br />later, will discuss funding needs to <br />repair the systems. <br /> <br />SUMMARY <br /> <br />The intent of this chapter has been to <br />outline the facilities required to meet <br /> <br />3-23 <br /> <br />potential aviation demands projected <br />for San Marcos Municipal Airport <br />through the long term planning horizon. <br />The next step is to develop a direction <br />for development to best meet these <br />projected needs. The remainder of the <br />master plan will be devoted to outlining <br />this direction, its schedule, and costs. <br />