My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-120
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2010 11:44:55 AM
Creation date
8/31/2010 11:20:14 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Date
8/17/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROFESSIONAL CONSULTING SERVICES AGREEMENT <br />This Agreement is effective August 17, 2010 between the City of San Marcos, Texas, <br />(the "City "), 630 East Hopkins, San Marcos, Texas 78666 and Luck Design Team, LLC (the <br />"Consultant "), 9600 Escarpment Blvd., Suite 745 -4 Austin, Texas 78749 for the provision of <br />professional consulting services in connection with the Gary Sports Complex Improvements — <br />Phase I Project (the "Project "), <br />The City and the Consultant agree as follows: <br />ARTICLE 1 <br />CONSULTANT'S SERVICES AND RESPONSIBILITIES <br />1.0 STANDARDS of PERFORMANCE <br />1.0.1 The Consultant will be responsible for the proper, accurate and adequate design and <br />preparation of a master plan for the softball complex, and the park site as well as technical plans, <br />specifications and other construction contract documents and for construction administration of <br />the girl's fast pitch softball complex portion of the Project. The Project is located on a 40 -acre <br />tract of land, which is commonly referred to as the Gary Sports Complex site (the Project site) <br />situated on Texas Highway 21 in San Marcos, Texas. The Project generally includes: <br />a) Restroom / concession building (1,600 s.f.) which includes the concrete foundation <br />system, restroom, concessions, mechanical, electrical and plumbing systems. (No <br />crow's nest or second story observation area is included as part of this Agreement.) <br />b) Four (4) 250' outfield fence portions for the girls softball fields; <br />b) One outfield fence special needs softball field as space permits; <br />c) Field lighting; <br />d) Site utilities -water and wastewater; <br />e) Grading drainage; <br />fl Landscaping and irrigation; and <br />g) Signage. <br />1.0.2 The Consultant's Basic Services consist of the services described in Sections 1.0 through <br />1.6 and include services to be performed through the following consulting disciplines as <br />subconsultants to the Consultant: <br />(1) Gomillion Kester Zimmerman, Inc. - Architecture Design Services <br />(2) K. Friese &Associates, Inc. -Civil Engineering <br />(3) Raba Kistner — Geotechnical Evaluation/Recommendations and Asbestos Survey <br />(4) Jones &Carter, Inc. - Surveying <br />(5) Johnson Consulting Engineers, Inc. - Electrical Engineering. <br />Luck Design — Gary Sports Complex Improvements — Phase I Project Agreement <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.