Laserfiche WebLink
AUTHORIZATION OF CHANGE IN SERVICES <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT: Quail Run Waterline Phase 2 <br />CONSULTANT: Byrn & Associates, Inc. <br />AUTHORIZATION NO,: _. <br />1 <br />ORIGINAL CONTRACT DATE: June 24 2008 <br />AUTHORIZATION DATE: Au ust 17, 2010 <br />WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SERVICES <br />At the request of the City, Byrn & Associates, Inc (BAI) revised the construction plans for the <br />proposed waterline to show an easement along Hunter Road that was twenty feet wide for the <br />portion of Hunter Road that contained a 10 foot wide road easement. The waterline easement <br />then widened to thirty feet for the remainder of the properties effected by the waterline. The <br />waterline was redesigned by BAI and plans were being finalized when, in the course of trying to <br />secure an easement, a sanitary sewer leaching bed was found to impact the new design. With <br />the cooperation of the landowner, the limits of the leaching bed were determined and the <br />waterline was again moved to avoid the leaching bed. <br />In addition, upon review by the City water department, it was determined that additional <br />waterlines, other than those marked by "one- call ", existed in the area. In cooperation with the <br />water department additional changes are to be made to connect the aforementioned waterlines <br />to the proposed 1 33 waterline. <br />Original contract Amount: <br />Previous contract amount: <br />Net increase /decrease in contract amount: <br />Revised contract amount: <br />$47,455.00 <br />$47 <br />$10 <br />$57,465.00 <br />Requested by: <br />Con Itant: <br />by: .� <br />Joh i J. Di ollino P. ./,Princi al Engineer <br />Prin ed name, title <br />Date: August 6, 2010 <br />Approved by: <br />City of San Marcos: <br />y: <br />Laurie Moyer, P.E., Interim city Manager <br />Date: <br />08/0 <br />