Laserfiche WebLink
is then fabricated, installed or completed. Tire Consultant will review the work and results of all <br />testing laboratories as required by the construction contract docmnents. <br /> <br />1.5.16 Review and make all decisions regarding the approval or talcing of other appropriate action <br />upon the Contractor's submittals, including but not limited to, shop ch'awings, product data and <br />smuples, schedule of values and progress schedule. Such action will be taken with reasonable <br />promptness, but generally not to exceed 15 days or such period of time as will not canse delay of the <br />Project. <br /> <br />1.5.17 Prepare minor changes in the plans and specifications as directed by the City; and prepare <br />necessary change orders in triplicate originals for approval by the City and execntion in accordance <br />with the construction contract documents. Consultant will not issue change orders not previously <br />approved in va'iting by City, and no course of conduct on the part of Consultant or City will amend, <br />waive or alter this provision. <br /> <br />1.5.18 Conduct professional inspections to determine the dates of substantial completion and final <br />completion ±hr the Project, to evaluate the work for acceptable conformance with the construction <br />contract documents and in light of any subsequent tests performed as described in Subsection 1.5.14 <br />to verify that any minor deviations fi'om the construction contract docmuents as described in <br />Subsection 1.5.14 have been corrected and that the reasons for any specific qualifications in any and <br />all previous certificates for payment as described in Subsection 1.5.14 hereof are either no longer <br />valid or the condition(s) and/or problem(s) have been corrected; shall receive and review written <br />warranties and related documents required by the construction contract documents and assembled <br />by the Contractor; will issue final certificates for payment or take other appropriate action; and will <br />mal~e a wa'itten recormuendation to the City regarding City's acceptance of the Project. <br /> <br />1.5.19 Require the submission by the Contractor, and subcontractors performing work on the Project <br />site, of periodic wage rate payment reports and, with the City's assistance, verify compliance with <br />federal and state wage rate requirements for the Project; and notice the City of any noncompliance, <br />or of the failure by the Contractor or subcontractor's to mal~e submissions. <br /> <br />1.5.20 Prepare, or cause to be prepared, and submit to the City a set of reproducible record drawings <br />showing significant changes in the work made during the construction phase. <br /> <br />1.5.21 Ensure that ali notices and signs required and provided by the City are posted in the <br />appropriate locations at the Project site by the Contractor. <br /> <br />1.5.22 Conduct final inspection with the City and prepare a punch list prior to final acceptance by <br />the City. <br /> <br />1.5.23 Prior to the end of the one year warranty period, review the completed Project with the City <br />and the Contractor and have all deficient items corrected. The extent of the duties, responsibilities <br />and limitations of authority of the Consultant as the City's representative during construction will <br /> <br />Byre contract.wpd 7 <br /> <br /> <br />