Laserfiche WebLink
EXHIBIT F <br />LIST OF POTENTIAL PUBLIC INFRASTRUCTURE AND IMPROVEMENTS <br />WATER (Refer to Exhibit F.1) <br />ITEM <br />DESCRIPTION <br />ESTIMATED COST <br />INCLUDING BOND <br />INTEREST <br />ESTIMATED COST <br />WITHOUT BOND <br />INTEREST <br />I <br />Hunter Road Water Lines <br />$ 3,696,078 <br />$ 2,088,180 <br />2 <br />So ars Tank U2grades <br />$ 4,077,921 <br />$ 2,303,910 <br />3 ' <br />Trunk Hill Tank <br />N/A <br />$ 862,500 <br />4 ' <br />Trunk Hill Pumps <br />N/A <br />$ 345,000 <br />5 <br />McCarty Tank Pumps <br />$ 1,4I6,000 <br />$ 800,000 <br />6 <br />Regional Water Line Infrastructure <br />N/A <br />$ 3,249,870 <br />WASTEWATER (Refer to Exhibit F.2) <br />ITEM <br />DESCRIPTION <br />ESTIMATED COST <br />ESTIMATED COST <br />INCLUDING BOND <br />WITHOUT BOND <br />INTEREST <br />INTEREST <br />I <br />Tonal Offsite Im rovements <br />$ 2,160,625 <br />$ 1,837,000 <br />Fq2Re <br />_L <br />Re Tonal OnSite Im rovements <br />NIA <br />$ 3,865,955 <br />ROADS /DRAINAGE (Refer to Exhibit F.3) <br />ITEM <br />DESCRIPTION <br />ESTIMATED COST <br />ESTIMATED COST <br />INCLUDING BOND <br />WITHOUT BOND <br />INTEREST <br />INTEREST <br />I <br />Centerpoint Extension <br />N/A <br />$ 9,870,725 <br />2 <br />Hunter Road Im rovements <br />N/A <br />$ 500,000 <br />RECLAIMED WATER LINE (Refer to Exhibit G) <br />ITEM <br />DESCRIPTION <br />ESTIMATED COST <br />ESTIMATED COST <br />INCLUDING BOND <br />WITHOUT BOND <br />INTEREST <br />INTEREST <br />I <br />Reclaimed Water Line <br />N/A <br />$ 2,185,000 <br />Notes: <br />I . These items are included in the City's CIP Impact Fee Project Plan. Costs for these items are <br />shown with and without bond interest. <br />2. These items are not in the City's current CIP Impact Fee Project Plan. The costs shown are <br />estimates prepared by the Engineer. These costs do not have bond interest costs calculated. <br />3. These items have been identified in the City's Future Capital Improvements Projects but have not <br />been included in the City's current CIP Project Plan <br />