Laserfiche WebLink
i) Sediment traps, and <br />j) Construction exits. <br />2) Permanent erosion control measures will be included on the above referenced erosion <br />and sediment control plans as needed to achieve a stable site and attain full erosion <br />protection of the ground surfaces. The Engineer will utilize appropriate TxDOT <br />seeding mixes and follow vegetation establishment techniques for this requirement. <br />3) Prepare a SW3P summary plan sheet(s) and device layout sheets in accordance with <br />Texas Pollution Discharge Elimination System ( "TPDES ") regulations and TxDOT <br />practices using standard TxDOT SW313 text sheet(s) to summarize erosion and <br />sediment control measures. <br />4) Prepare erosion and sediment control details for any related items that are not covered <br />by TxDOT standard details. <br />1.7.13 Deliverables. As part of this Task 1.6 deliver to the City: <br />1) Preliminary Submittals: Capacity and past performance assessment of existing <br />drainage system including any existing storm drains pertinent to this project. This <br />information will be submitted via electronic mail. <br />2) 30% Submittal: <br />a) Preliminary Hydraulics Report. <br />b) Preliminary Culvert Layout and Hydraulic Data Sheets. <br />3) 60% Submittal: <br />a) Drainage Plan and Profile. <br />b) Drainage Structures Details. <br />c) Storm Water Pollution Prevention Plan including details and pay quantities. <br />d) Updated (as necessary) Hydraulic Report. <br />e) Updated (as necessary) Culvert Layout and Hydraulic Data Sheets. <br />4) 90% Submittal: <br />a) Final Hydraulic Report. <br />b) Final Culvert Layout and Hydraulic Data Sheets. <br />1.8 TASK 8 - SIGNING, PAVEMENT MARKING, SIGNALIZATION (Permanent) <br />(TxDOT Function Code 162) <br />The Engineer will: <br />1.8.1 Design pavement marking layouts in accordance with the approved design schematic and <br />summaries in accordance with the Texas Manual on Uniform Traffic Control Devices <br />( "MUTCD ") manual. <br />1.8.2 Develop signing layouts as required for the Project. In addition, the Engineer will <br />develop sign details, both large and small, and a summary of pavement markings, small signs <br />and large signs for inclusion in the construction technical specifications and plans. <br />1.8.3 Traffic SiLynal Warrant Study. <br />HDR— Loop 82 Project Agreement <br />22 <br />