My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2010-156 (Tabled)
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2010
>
Res 2010-156 (Tabled)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2011 10:08:51 AM
Creation date
12/29/2010 10:18:35 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Date
10/19/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1) Data Collection. <br />2) <br />3) <br />a) Observe existing traffic operations at the study area intersections to note <br />operational problems, traffic patterns, parking, etc. <br />b) Obtain AM and PM peak hour turning movement counts at the following <br />intersections to determine existing background traffic: <br />i) Loop 82 and Laurel Street; and <br />ii) Loop 82 and Post Road/Bobcat Road. <br />c) Obtain 24 -Hour directional tube counts at the following locations: <br />i) Loop 82, westbound, east of Laurel Street; <br />ii) Loop 82, eastbound, west of Laurel Street; <br />iii) Laurel Street, southbound, north of Loop 82; <br />iv) Old Post Road, southbound, north of Loop 82; <br />v) Post Road, southbound, north of Loop 82; <br />vi) Loop 82, westbound, east of Post Road; <br />vii) Loop 82, eastbound, west of Post Road; and <br />viii) Bobcat Road, northbound, south of Loop 82. <br />d) Coordinate with San Marcos Police department to obtain crash data at the existing <br />intersection of Loop 82 and Post Road/Bobcat Road. <br />Analvsis. <br />a) Coordinate with TxDOT to get an approved scope of study for the warrant <br />analysis. <br />b) Develop 24 -hour traffic volumes at the proposed intersection of Loop 82 and <br />Laurel Street due to the re- alignment of Loop 82. <br />c) Perform a signal warrant analysis at the proposed intersection of Loop 82 at <br />Laurel Street and the existing intersection of Loop 82 at Post Road/Bobcat Road <br />based on guidelines set forth in the 2006 Texas MUTCD. <br />Traffic Signal Design Plans (Based on TxDOT's analysis that signal warrants have <br />been met). This stage includes preparation of traffic signal design plans at the <br />intersections of Loop 82 at Laurel Street and Loop 82 at Post Road, if traffic signal <br />warrants are met and approved by TxDOT. <br />a) Meet with TxDOT and the City as necessary to discuss signal design <br />requirements. One (1) meeting has been assumed for budget purposes. <br />b) Obtain electronic plans for the Project, including survey files, proposed roadway <br />layouts, utilities, and proposed pavement marking layouts from the City. <br />c) Coordinate with Texas One Call System and City/TxDOT to locate utilities in the <br />field. <br />d) Conduct a detailed field review of the intersection to note and verify existing <br />traffic signal equipment, existing intersection geometrics, physical constraints, <br />power connection, utility placement, and any other details necessary for signal <br />plan preparation. <br />e) Attend a meeting in the field with TxDOT and the City to locate and confirm <br />locations of proposed controller and signal poles. For budget purposes, the City <br />and Engineer anticipate that there will be one (1) meeting. <br />HDR — Loop 82 Project Agreement <br />23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.