Laserfiche WebLink
AUTHORIZATION OF CHANGE IN SERVICES <br />CITY OF SAN MARCOS, TEXAS <br />PROJECT: Victory Gardens Subdivision — North Section <br />ENGINEER: Bain Medina Bain <br />MASTER AGREEMENT DATE: January 5, 2010 <br />AUTHORIZATION NO.: 2 <br />DATE OF CHANGE: 1 -11 -2011 <br />WORK TO BE ADDED TO OR DELETED FROM SCOPE OF SERVICES <br />The following is a description of our scope of services: <br />1. BMB will provide surveying, metes and bounds for up to 50 corner clips as shown on the <br />Victory Gardens — North Section <br />corner clip plan sheet. <br />2. Waterline Easement for 24" bore under UPRR (between Railroad and S. Mitchell). BMB will <br />prepare temporary construction <br />easements, as needed. <br />3. Temporary construction easement for sewerline bore pits related to TX -DOT requirements, if <br />needed to tie sewer main from Roosevelt to S. Guadalupe. <br />4. Temporary construction easement /permit for sewerline bore pits related to UPRR <br />requirements to tie sewer main on Patton Street. <br />5. Drainage easement at end of MacArthur Street and Willow Springs Channel. <br />Previous contract amount: <br />Net increase /decrease in contract amount: <br />Revised contract amount: <br />Requested by: <br />BY:ii <br />_Carl Bain, P.E., Vice President <br />Printed name, title <br />Approved by: <br />$_$461,687.00 <br />$_$87,500.00 <br />$_$549,187.00 <br />Date: 1 -11 -2011 _ <br />City of San Marcos: Date:�/� %�� <br />By: <br />