My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2002-014
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2002
>
Ord 2002-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2005 3:33:26 PM
Creation date
10/27/2005 3:32:40 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amendment
Number
2002-14
Date
2/11/2002
Volume Book
146
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SAN MARCOS ELECTRIC UTILITY <br />ELECTRIC RATE SCHEDULES <br /> <br />MEDIUM GENERAL SERVICE <br />Rate Schedule - MGS <br /> <br />Effective: February 11th, 2002 <br /> <br />Page 3 <br /> <br />b. 65.0% of the highest kW demand established during any 30 minute interval during the immediately <br />preceding 11 months; or <br /> <br />c. 30 kW. <br /> <br />Time Differentiated Service: <br /> <br />The BILLING DEMAND each month for Time Differentiated Service during the On-Peak Periods shall be the <br />greater of: <br /> <br />a. the highest metered kW demand established during any 30 minute interval during the On-Peak Periods of <br />the month; <br /> <br />b. 65.0% of the highest kW demand established during any 30 minute interval during the On-Peak Periods of <br />the immediately preceding 11 months; or <br /> <br />c. 30 kW. <br /> <br />The BILLING DEMAND each month for Time Differentiated Service during the Off-Peak Periods shall be the <br />difference between the highest metered kW demand established during any 30 minute interval during the <br />Off-Peak Periods of the month and the BILLING DEMAND determined for the On-Peak Periods of the month. <br /> <br />POWER FACTOR ADJUSTMENT <br /> <br />The monthly metered kW demand may be adjusted to an equivalent 90.0% power factor for the purpose of establishing <br />the monthly BILLING DEMAND when the power factor at the point of delivery to the Customer is determined to be less <br />than 90.0%. Such adjustment will be deferred for 6 months at a new point of delivery to allow for corrective action by the <br />Customer. <br /> <br />TERM OF CONTRACT <br /> <br />Regular Service under this rate schedule is subject to termination at any time upon the City's receipt of written notice from <br />the Customer, subject to the provisions of the Rules and Regulations for Electric Service. <br /> <br />Time Differentiated Service under this rate schedule is subject to termination only pursuant to the terms and conditions of <br />the contract the Customer entered into for Time Differentiated Service. <br /> <br />INTERRUPTION OF SERVICE <br /> <br />The City will make reasonable provIsions to ensure satisfactory and continuous service, but does not guarantee a <br />continuous supply of electric power and energy from the City System facilities and shall not be liable for damage <br />occasioned by interruptions of service or failure to commence delivery caused by acts of God, or the public enemy, or for <br />any cause reasonably beyond the control of the City, including, but not limited to, the failure or breakdown of facilities, <br />floods, fire, strikes, or actions or orders of any agency having jurisdiction in the premises, or for interruptions which are <br />~cessary for inspection, repair, or changes in the equipment and facilities of the City, the City System or the bulk power <br />Ipplier(s) to the City System. The Customer shall notify the City immediately of any defect, trouble or accident which may <br />any way affect the delivery of electric service by the City from the City System. <br /> <br />C:\TEMP\Electric Utility tariffs.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.