Laserfiche WebLink
<br />a. The School District will meet the City's landscaping standards that were <br />in effect prior to the LDC by installing 49 trees at least 2 W' in caliper within the <br />vehicle parking areas. Nine of these trees will double as street trees along <br />McCarty Lane. All parking areas will be within 60 feet of a landscaped area. <br /> <br />b. As per the LDC, the School District will install 63 street trees (nine of <br />which will also count towards the 49 trees above) within 10 feet of the property <br />line along County Road 266 and McCarty Lane. <br /> <br />c. The School District will provide screening for 60% of view of parking <br />areas by installing shrubs, berms, or walls. <br /> <br />d. The School District will install an irrigation system for all landscaping <br />installed. <br /> <br />2. Five Year Completion: The School District agrees to meet the normal <br />landscaping requirements described in Section 2.A within five years of the time of <br />completion of the High School Project as follows: <br /> <br />a. The School District will install 33 remaining 2" caliper trees (mature <br />crown greater than 15ft) within the developed area. Based on the success of a <br />Tree and Shrub Donation Program, the School District will seek to exceed this <br />requirement if possible. <br /> <br />b. The School District will plant 455 shrubs- One gallon ea. within the <br />developed areas. Based on the success of a Tree and Shrub Donation Program, the <br />School District will seek to exceed this requirement if possible. <br /> <br />c. The School District will set aside and preserve 13% of the area of the <br />Project Site as green space rather than the 10% required by the LDC. <br /> <br />d. The School District will install an irrigation system for all landscaping <br />installed. <br /> <br />e. The School District will install grass and an irrigation system for all <br />athletic fields. <br /> <br />Conceptual representations of the landscape phasing are shown in the attached Exhibit A. <br /> <br />Section 3. Miscellaneous Provisions <br /> <br />A. Cooperation. This City and the School District agree to cooperate with each other, in <br />good faith, at all times during the term hereof in order to achieve the purposes and intent of <br />this Agreement. <br /> <br />3 <br />