My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-144
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2006 8:03:13 AM
Creation date
6/23/2006 8:02:41 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2005-144
Date
10/4/2005
Volume Book
163
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2.4 Be responsible for the cost of printing and binding of the bid documents. <br /> <br />2.5 Bear all costs incident to this Article. <br /> <br />ARTICLE 3 <br />CONSTRUCTION COST <br /> <br />3.1 DEFINITION <br /> <br />3.1.1 The construction cost will be the total cost or estimated cost to the City of all elements of <br />the Project designed or specified by the Consultant. <br /> <br />3.1.2 The construction cost will include at current market rates, including a reasonable <br />allowance for overhead and profit, the cost of any equipment which has been designed, specified, <br />selected or specially provided for by the Consultant, except that used materials and equipment <br />will be included as if purchased new for the Project. <br /> <br />3.1.3 Construction cost does not include the compensation of the Consultant and the <br />Consultant's consultants, or other costs which are the responsibility of the City as provided in <br />Article 2. <br /> <br />3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> <br />3.2.1 Evaluations of the City's Project budget and detailed cost estimates, if any, prepared by <br />the Consultant, will represent the Consultant's best judgment as a design professional familiar <br />with the construction industry. <br /> <br />3.2.2 A fixed limit of construction cost for this Project will be established by the City's <br />representative after consulting with the Consultant. The Consultant will be permitted to include <br />contingencies for design, bidding and price escalation, to determine what materials, equipment, <br />and types of construction are to be included in the construction contract documents, to make <br />reasonable adjustments in the scope of the Project and to include in the construction contract <br />documents alternate bids to adjust the construction cost to the fixed limit. The fixed limit of <br />construction cost may be increased by the City. <br /> <br />3.2.3 If the lowest bona fide bid exceeds the Consultant's most recent approved cost estimate <br />established as a condition of this Agreement, the City will (1) give written approval of an <br />increase in such fixed limit, (2) authorize rebidding of the Project within a reasonable time, or (3) <br />cooperate in revising the Project scope and quality to reduce the construction cost. During the <br />development of the Project through the phases described by Article 1 of this Agreement and <br />prior to the City's final approval of construction contract documents, the Consultant will monitor <br />the established probable construction cost in relation to the established fixed limit. <br /> <br />If necessary, the Consultant will implement construction cost savings measures or <br /> <br />Lang,t{)nl Contract <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.