Laserfiche WebLink
<br />C. The CITY shall deliver two copIes of all recorded plats for subdivisions <br /> <br />within the CITY's ETJ to the COUNTY within 10 working days of the <br /> <br />recording of the subdivision plat. For all subdivisions containing more than <br /> <br /> <br />five lots, the CITY shall also provide to the COUNTY a digital file of the <br /> <br /> <br />subdivision plat including at least two ground control GPS points in a format <br /> <br /> <br />approved by the COUNTY. <br />D. The CITY shall confer with the Caldwell County 911 Addressing Division <br /> <br />conceming street names prior to final plat approvaL <br /> <br />E. The CITY shall allow COUNTY inspectors access to road construction sites <br /> <br /> <br />of subdivisions within the ETJ, and the CITY shall timely submit copies of all <br /> <br /> <br />road design materials and road construction test results to the COUNTY <br /> <br /> <br />during road construction. CITY inspectors shall have inspection and approval <br /> <br />authority over the road construction, stormwater drainage construction, and <br /> <br />water and wastewater facility construction within the right-of-way and <br /> <br />easements. The COUNTY may request that the CITY issue a stop-work <br /> <br />notice if the applicable construction standards are not being met. <br /> <br />F. The CITY shall have the right to charge reasonable fees, sufficient to cover <br /> <br />the full cost of services provided by the CITY under this Agreement and <br /> <br />otherwise in the administration of CITY regulations that apply to subdivisions <br /> <br />in the CITY's ETJ. <br /> <br />G. As an attachment to this agreement, the CITY shall provide a current map <br /> <br />defining the legal boundaries of its corporate limits and areas of ETJ. The <br /> <br />CITY shall notify the COUNTY of any changes to the CITY's ETJ within 10 <br /> <br />5 <br />