Laserfiche WebLink
Weldin Shop <br />Aircraft Support and Related Services <br />Airport <br />Manufacturin <br />Contractor's Office /Sales, With Outside Storage including Vehicles <br />Distribution Center <br />Electronic Assembly/High Tech Manufacturin <br />Engine Repair/Motor Manufacturing Re-Manufactu ring and /or Repair <br />Food Processing no Outside Public Consumption <br />Laboratory Equipment Manufacturin <br />Leather Products Manufacturin <br />Machine Sho <br />Manufacturing Processes not Listed <br />Marble or Stone Finishin <br />Micro Brewer onsite mfg. and sales <br />Motor Freight Terminal <br />Outside Storage as primary use <br />Paint Manufacturin <br />Petroleum Bulk Storage <br />Plastic Products Mold in /Resha in <br />Research Lab Non - Hazardous <br />Sand /Gravel Sales (Storage or Sales <br />Sign Manufacturin <br />Stone /Cla /Glass Manufacturin <br />Wrecking/Junk Yard <br />Section 6: Development Standards <br />6.01 Landscape Standards <br />The Project Site shall meet or exceed the minimum requirements of the City of San <br />Marcos LDC for landscaping. All landscaping shall meet the requirements of Chapter 6, <br />Article 1, Division 1 of the City of San Marcos LDC. <br />The site design will employ green /sustainable solutions in one form or another including, <br />but not limited to, indigenous plantings within landscaped areas, tree islands within the <br />streetscape frontage to reduce the heat island effect, strategic tree placement for wind <br />and solar break, permeable paving materials such as pervious concrete in parking or <br />drive areas, crushed granite for walking paths, or a combination thereof, bicycle racks <br />within the parking garage for tenants, the use of recycled landscape materials such as <br />mulch and compost, and utilizing the natural flow of the site to reduce curb and gutters. <br />The Project Site shall utilize a variety of Low Impact Development (LID) design <br />strategies including, but not limited to, rainwater harvesting, bioswales in parking areas, <br />biofiltration ponds, native plants for landscaping, preservation and /or mitigation of <br />existing shade trees and low volume irrigation for all planting areas. Detailed standards <br />for the LID practices to be utilized on this site are included in Exhibit D. The Project Site <br />shall utilize water collected from rainwater harvesting as the primary source of water for <br />11 <br />