My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2002-112
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2002
>
Res 2002-112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2006 2:50:15 PM
Creation date
6/26/2006 2:49:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2002-112
Date
6/10/2002
Volume Book
148
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />$15,000. <br /> <br />ARTICLE 2 <br />THE CITY'S RESPONSIBILITIES <br /> <br />The City will: <br /> <br />2.1 Provide full information to the Engineer regarding the City's requirements for the Engineer's <br />services under this Agreement. The City will furnish the Engineer with copies of official City design <br />standards and construction standards, and other data and information in the City's possession needed <br />by the Engineer at the Engineer's request. <br /> <br />2.2 Designate Sabas Avila as the City's Project Manager and authorized representative to act <br />on the City's behalf with respect to this Agreement. The City will examine the documents and <br />information submitted by the Engineer and promptly render responses to the Engineer on issues <br />requiring a decision by the City. <br /> <br />2.3 Provide access to and make all necessary provisions for the Engineer to enter public and <br />private property as required for the Engineer to perform its services under this Agreement. <br /> <br />2.4 Bear all costs incident to this Article. <br /> <br />ARTICLE 3 <br />CONSTRUCTION COST <br /> <br />3.1 DEFINITION <br /> <br />3.1.1 The construction cost will be the total cost or estimated cost to the City of all elements of the <br />Project designed or specified by the Engineer. <br /> <br />3.1.2 The construction cost will include at current market rates, including a reasonable allowance <br />for overhead and profit, the cost of any equipment which has been designed, specified, selected or <br />specially provided for by the Engineer, except that used materials and equipment will be included <br />as if purchased new for the Project. <br /> <br />3.1.3 Construction cost does not include the compensation of the Engineer and the Engineer's <br />consultants, or other costs which are the responsibility of the City as provided in Article 2. <br /> <br />3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> <br />3.2.1 Evaluations of the City's Project budget and detailed cost estimates, if any, prepared by the <br />Engineer, will represent the Engineer's best judgment as a design professional familiar with the <br />construction industry. <br /> <br />Loop 82-Sessom Drive.wpd <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.