Laserfiche WebLink
<br />to verify that any minor deviations from the construction contract documents as described in <br />Subsection 1.3.26 have been corrected and that the reasons for any specific qualifications in any and <br />all previous certificates for payment as described in Subsection 1.3.26 hereof are either no longer <br />valid or the condition(s) and/or problem(s) have been corrected; shall receive and review written <br />warranties and related documents required by the construction contract documents and assembled <br />by the Contractor; will issue final certificates for payment or take other appropriate action; and will <br />make a written recommendation to the City regarding City's acceptance of the Project. <br /> <br />1.3.31 Require the submission by the Contractor, and subcontractors performing work on the Project <br />site, of periodic wage rate payment reports and, with the City's assistance, verify compliance with <br />federal and state wage rate requirements for the Project; and notice the City of any noncompliance, <br />or of the failure by the Contractor or subcontractor's to make submissions. <br /> <br />1.3.32 Prepare, or cause to be prepared, and submit to the City a set of reproducible record drawings <br />showing significant changes in the work made during the construction phase. <br /> <br />1.3.33 Ensure that all notices and signs required and provided by the City are posted in the <br />appropriate locations at the Project site by the Contractor. <br /> <br />1.3.34 Conduct final inspection with the City and prepare a punch list prior to final acceptance by <br />the City. <br /> <br />1.3.35 Prior to the end of the one year warranty period, review the completed Project with the City <br />and the Contractor and have all deficient items corrected. The extent of the duties, responsibilities <br />and limitations of authority of the Engineer as the City's representative during construction will not <br />be modified or extended after the construction contract documents have been authorized by the City <br />to be competitively bid without written consent of the City and the Engineer and with notice to the <br />Contractor. <br /> <br />1.4 ADDITIONAL SERVICES <br /> <br />1.4.1 Since the Engineer's compensation is a fixed fee for Basic Services, including minor <br />deviations from those described in this Agreement, compensation to the Engineer for additional <br />services will only be for substantial deviations from the scope of services described in this <br />Agreement. The Engineer will submit a written estimate of fees to the City and obtain the City's <br />authorization before initiating any additional services <br /> <br />1.4.2 Each material change (deletion or addition) in the services to be provided by Engineer must <br />be authorized by the City on the Authorization of Change in Services form attached to this <br />Agreement as Attachment A. Compensation for additional services will be in addition to that <br />specified for Basic Services in accordance with Section 14.3 ofthis Agreement. The approval of the <br />City's governing body is necessary for all additional services the compensation for which exceeds <br /> <br />Loop 82-Sessom Drive.wpd <br /> <br />8 <br />