<br />of data and information the Engineer needs to perform its services, and the Engineer will meet with <br />City representatives at mutually convenient times to assemble this data and information. <br /> <br />1.1. 7 Assemble a Project team comprised of the City's representatives and the Engineer's <br />representatives. The Engineer will meet with the Project team to set the design and production <br />schedule and parameters for all subsequent work, to verify the components within which all Project <br />participants must perform, and to identify all parties and significant deadlines involved in the <br />comprehensive schedule strategy. Based on this information, the Engineer will prepare a detailed <br />schedule of its work for the Project addressing each component of the work to be done, indicating <br />the points of involvement of all project participants. The Engineer will conduct weekly progress <br />meetings between the Project team and the Contractor once the construction contract is executed. <br /> <br />1.2 TASK 1- SURFACE WATER TREATMENT PLANT RE- RATING EVALUATION <br /> <br />The Engineer will: <br /> <br />1.2.1 Meet with the City and GBRA to identify any known "bottlenecks" or limitations in the <br />surface water treatment plant treatment process or operations. <br /> <br />1.2.2 Evaluate the significance of any identified process "bottlenecks" including algae build up on <br />the tube settlers and the use of chlorine dioxide. <br /> <br />1.2.3 Review and evaluate data obtained from previous re-rating study. <br /> <br />1.2.4 Evaluate process loadings at 9 MGD and/or other potential capacities and compare with <br />TCEQ (formerly TNRCC) and other recognized criteria. <br /> <br />1.2.5 Perform a hydraulic evaluation ofthe plant to determine the hydraulic capacity and identify <br />hydraulic limitations. <br /> <br />1.2.6 Prepare a disinfection CT evaluation for the requested re-rated capacity. <br /> <br />1.2.7 Determine the capacity the plant can support without any improvements and identify <br />improvements necessary for additional re-rating with a goal to reach at least 9 MGD with as few <br />improvements as possible. <br /> <br />1.2.8 Prepare five (5) copies of a draft Re-rating Study for review by the City. <br /> <br />1.2.9 After receiving comments from the City, prepare ten (10) copies of a final report to be <br />submitted to TCEQ to support a plant capacity up rating request. Meet with TCEQ to review the <br />request. <br /> <br />1.2.10 Conduct (4) meeting/site visits with City staff and TCEQ as follows: <br /> <br />AlanPlummer. wpd <br /> <br />2 <br />