Laserfiche WebLink
<br />City of San ~farcos <br />LPST # 92680 <br /> <br />"'orksheet for Site Assessment <br /> <br />Part A. Per-sonne: Cas 1 <br />Seenon 1. F1>;ed :=;eld and Office Cost, Gaining Off-site Access <br /> <br />Item Activit). l'nit Cost Units/Hours Total <br />Prelimmary Planr.mg Site Familiarization 5390.00 1 S~j<::()O <br />Water Well Othe:- Faclln) Search Identify Other Wells'Facllmes 5300.00 S(;'JO <br /> Near Site <br />Walking Recepto7 SUT\'ey Field Time to Identify Receptors 5300.00 1 5~~j00 <br />Site MOnItoring Well Survey Determine Well Elevations $300.00 1 5YJJ.OO <br />Workplan & Cos: Proposal Preparation and Submission 5115.00 I S11500 <br />Offsite Access Research ownership and make <br /> initial written request for Offsite 5320.00 50.00 <br /> Drilling (per offsite site) <br /> Total Sec. 1 51,10500 <br /> <br />Section 2: Variable Office & Field Personnel Cost <br />Section 2A: Basic Report Generation Cost <br /> <br />Item Activit)' Unit Cost Units/Hours T ota.! <br />No Report ReqUITed Submit Results (Labs and 50.00 0 5000 <br /> Drillers' Logs) Only <br />FAR - Site Assessment Preparation and Submission 5485.00 I $485.00 <br />Plan A Risk Assessment Report Preparation and Submission 52,140.00 50.00 <br />Form <br />Plan B Risk Assessment Preparation and Submission $5,715.00 $D.OO <br />RA Update Preparation and Submission $485.00 50.00 <br /> Total Sec. 2A $48500 <br /> <br />Section 2B: Additional Office Personnel Cost, Conventional Drilling, (> 3 WellsfBorings per Event) <br /> <br />Item Activit). Unit Cost Units/Hours To ta.! <br />Project Manager (PM) Project Oversite (per well or $40.00 5000 <br /> boring) <br />Draftsperson (D I) Boring & Well Logs, CAD (per $22.5C SO.OO <br /> well or boring) <br />Word Processing Report Prep (per well/boring) $1 7.50 $D.OO <br /> Total Sec. 2B 50.00 <br /> <br />Section 2C: Additional Office Cost, Direct Push <br /> <br />Item Activity Unit Cost Units/Hours T ota.! <br />Project Manager (PM), 1st Day Project Oversite (2 per eVCllt) S80.00 SO.OO <br />Draftsperson (DI), 1st Day Borings & Well Logs, CAD (2 $45.00 SO.OO <br /> per event) <br />Word Processing (WP). 1st Day Report Prep $35.00 SO.OO <br />Project Manager (PM), Each Project Oversite $40.00 50.00 <br />Add'l 112 Day <br />Draftsperson (DI), Each Add'l Boring & Well Logs, CAD S22.5C SO.OO <br />1/2 Day <br />Word Processing (WP), Each Report Prep SI7.5C SO.OO <br />Add'l l/2 Day <br /> Total Sec. 2C SO.OO <br /> <br />3<1.01 <br />