My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2001-113
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2001
>
Res 2001-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2006 3:02:38 PM
Creation date
7/6/2006 3:01:41 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2001-113
Date
6/25/2001
Volume Book
144
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of San ~brcos <br />LPST # 92680 <br /> <br />Part B Drilling COS! <br />Section 1: Comer,tlonal Drlllmg Costs <br />SubsectlOn J A ConventIOnal Drilling Costs Drilhng Method: HSA_XX, AIr/Mud Rotary _, AIr Conng <br />(Dnllmg cost vary dependIng upon diameter of well and lvpe of drillin2 requIred... see appendIx J) <br /> <br />~ - <br />Borings [nit Cost t: nits Total <br />Flrsl 25 Feet (per well) 5775.00 50.(J(J <br />26 - 50 Feet (per FOOl) 525.00 50.00 <br />50 - 100 Feet (per Foot) $43.00 50 (J() <br />> 100 Feet (per FOOl) 561.50 5000 <br /> <br />2" Wells <br /> <br />FIrst 25 Feet (per well) 5J,025.00 2 52,050.00 <br />26 - 50 Feet (per Foot) $43.50 20 5870.00 <br />50 - 100 Feet (per Foot) 551.50 $000 <br />> 100 Feet (per Foot) 554.00 5000 <br /> <br />4" \Vells <br /> <br />First 25 Feet (per well) 51,187.50 50.00 <br />26 - 50 Feet (per Foot) 554.00 SO.OO <br />50 - 100 Feet (per Foot) 561.50 $0.00 <br />> 100 Feet (per Foot) 580.00 50.00 <br /> Total, Subsec. IA 52,920.00 <br /> <br />Subsection J B: Other Cost, Conventional Drilline <br /> <br /> - <br />Item Activity Unit Cost Units Total <br />M obi I izati on/Demobi Iization First 50 miles one Way 5245.00 I 5245.00 <br />M obi lizati onlDemobil ization Mileage> 50, (Max. 200 miles) 52.50 50.00 <br />Drill Crew Per Diem Each Overnight Stay. Ifrequired 5190.00 I 5190.00 <br />Small Items (I unit1site day) 520.00 2 $40.00 <br /> Total, Subsec. I B $475.00 <br /> Subtotal Sed: (l A & 1 B) 53,395.00 <br /> 15% Mark-up 5509.25 <br /> Total Section 1 53,90425 <br /> TOUll Part B $3,904.25 <br /> <br />Part C: Waste ,Management <br /> <br />Item Unit Cost UnitslHours Total <br />Vacuum Truck (per hour) 575.00 3 5225.00 <br />Fluid Disposal $O.4C 150 560.00 <br />Soil Disposal (Base Cost) $250.00 I 5250.00 <br />Soil Disposal (-{).2 ey/l 0' of drilled well), (per cubic yard) S I 0.50 <br />Soil Disposal (-1 drumil0' of drilled well), (per drum) $45.00 4 5180.00 <br />Subchapter H Discharge or Alternate Disposal Method As Needed 50.00 <br /> Subtotal Part C $7 I 5.00 <br /> 15% Mark-up S107.25 <br /> Total Part C S822.25 <br /> <br />;'1:01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.