My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2001-113
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2001
>
Res 2001-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2006 3:02:38 PM
Creation date
7/6/2006 3:01:41 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2001-113
Date
6/25/2001
Volume Book
144
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of San Marcos <br />LPST # 92680 <br /> <br />SectlOn 2D: Dnllmg m Sand'S11vClay 'Ai:h Hollow Stem Augers <br /> <br />Item Activity linit Cost l" nits/H ou rs Total <br />Fleld Engineer/Geologist (FD) & Install Bonngs, 25' Minimum. <br />Techmclan I (Tl) Lump SL:;T'., 2 Hrs./Boring (per 5~~0.00 50.00 <br /> Boring) <br />Field Engmeer/Geologlst (FD) & Install Wells, 25' Minimum, <br />Technician 1 (TI) Lump SlI:T'... 2.5 Hrs.lWell (per 5~75.00 2 5550.00 <br /> Well) <br />Field Engmeer/Geologist (FD) & Install Borings, Sum of Footage 57.69 50.00 <br />Technician I (TI) Over 25', All Borings (per foot) <br />Field Engineer/Geologist (FD) & Install Wells, Sum of Footage 59.91 20 5198.20 <br />Technician I (Tl) Over 25', .".11 Wells (per foot) <br /> Total Sec. 2D 5748.20 <br /> <br />SectlOn 2E: Dnlling wHh AIr/Mud RotaI) <br /> <br />Item Activity Unit Cost Vnits/Hours Total <br />Field Engineer/Geologist (FD) & Install Borings, 25' Minimum, <br />Technician I (TI) Lump Sum, 1.25 Hrs./Boring (per 5 I 38.00 5000 <br /> Boring) <br />Field Engineer/Geologist (FD) & Install Wells, 25' Minimum, <br />Technician I (TI) Lump Sum, 2.5 Hrs.!Well (per 5275.00 50.00 <br /> Well) <br />Field Engineer/Geologist (FD) & Install Borings, Sum of Footage S5.12 50.00 <br />Technician I (TI) Over 25', All Borings (per foot) <br />Field Engineer/Geolog1st (FD) & Install Wells, Sum of Footage 59.40 50.00 <br />Technician I (TI) Over 25'. All Wells (per foot) <br /> Total Sec. 2E SO.OO <br /> <br />Sectlon 2F: Drilling with Air Coring <br /> <br />Item Activity Unit Cost Units/Hours Total <br />FIeld Engmeer/Geologist (FD) & Install Borings, 25' Minimum, <br />Technician I (Tl) Lump Sum, 2 Hrs./Boring (per 5220.00 50.00 <br /> Boring) <br />Field Engineer/Geologist (FD) & Install Wells, 25' Minimum, <br />Technician I (TI) Lump Sum, 2.5 HrsJWell (per S275.00 50.00 <br /> Well) <br />Field Engineer/Geologist (FD) & Install Borings, Sum of Footage S7.33 50.00 <br />Technician I (TI) Over 25', All Borings (per foot) <br />Field Engineer/Geologist (FD) & Install Wells, Sum of Footage 59.57 SO.OO <br />Technician I (TI) Over 25', All Wells (per foot) <br /> Total Sec. 2F SO.OO <br /> <br />Section 2G: Direct Push <br /> <br />Item Activity Unit Cost U nitsIH 0 u rs Total <br />Field Engineer/Geologist (FD) & First Day, Lump Sum S 1, 100.00 SO.OO <br />Technician I (TI) <br />Field Engineer/Geologist (FD) & Each Additional 1/2 Day 5550.00 50.00 <br />Technician I (TI) <br /> Total Sec. 2G 50.00 <br /> Total Sec. 2: (2A through 2G) SI,233.20 <br /> TOtal Part A: (Sec./' + Sec.2) $2,338.20 <br /> <br />3dnl <br />
The URL can be used to link to this page
Your browser does not support the video tag.