Laserfiche WebLink
<br />Cit). of San Marcos <br />LPST # 92680 <br /> <br />Part D. Anallllcal Costs <br /> <br />Item rnits Unit Cost Units/Hours Total <br />BTEX - Sol1 per sample 562.50 6 5375.00 <br />TPH - Sol1 per sample S62.50 6 537500 <br />PAH (8270) - SOli per sample 5249.00 SO.OO <br />BTEX/MTBE - Water per sample 585.00 12 51,020.00 <br />TPH - Water per sample 562.50 12 S750.00 <br />PAH (8270) - Water per sample 5249.00 SO.OO <br />TDS - Water per sample 515.00 SO.OO <br />Total Lead - Soil per sample 593.00 2 S 186.00 <br />BTEX!MTBE - Soil per sample S80.00 SO.OO <br />BTEX - Water per sample 562.50 SO.OO <br />PAH (8100) - Soil per sample S 158.00 SO.OO <br />PAH (610) - Water per sample 5222.00 SO.OO <br />VOC - Soil per sample 5295.00 SO.OO <br />VOC - Water per sample 5295.00 $0.00 <br />8 ReRA Metals - Soil per sample 5150.00 $0.00 <br />Soil Parameters per sample 5300.00 SO.OO <br />Shipping per sample S5.00 38 $ 190.00 <br />Other SO.OO <br />Other SO.OO <br /> Subtotal Part D S2,896.00 <br /> 15% Mark-up $434.40 <br /> Total Part D $3,330.40 <br /> <br />Part E: Travel Costs <br /> <br />Item Unit Cost Units/Hours Total <br />EqUIpment Truck (per day) 5140.00 3 $420.00 <br />Mileage (over 100 miles round trip), (per mile) SO.31 SO.OO <br />Travel Time (Field Engmeer/Geologist), (per hour) $65.00 6 $390.00 <br />Travel Time (Tech. I), (per hour) $40.00 4 S 160.00 <br />Per Diem (per day per person) 580.00 SO.OO <br />Small Items 520.00 3 S60.00 <br />Disposable Bailers (per well) $8.OC 1\ S88.00 <br />Drums (per drum) $40.00 6 5240.00 <br /> Total Part E $1.358.00 <br /> Total ActiVity Cost 511,753.10 <br /> <br />YJ,lll <br />