Laserfiche WebLink
<br />1.3.11 Ensure that no reports, maps, or other documents produced in whole or in part <br />under this Agreement shall be the subject of an application for copyright by or on behalf <br />of the Engineer. <br /> <br />1.3.12 Obtain approval from the City of all technical plans and specifications necessary <br />for successful completion of the Project prior to allowing the construction contract to be let <br />for bid. <br /> <br />1.3.13 Assist the City in the distribution of the bid documents to prospective bidders and <br />to plan rooms and the issuance of addenda (if any) following City's prior approval. <br /> <br />1.3.14 Assist the City in obtaining bids, tabulating bids, preparing bid tabulation forms, and <br />in awarding the contract for construction following the City's approval of the construction <br />contract documents and of the latest detailed final cost estimate of the Project. <br /> <br />1.3.15 Assist the City in reviewing the Statement of Bidder's Qualifications, financial <br />statements of bidders, lists of bidders' proposed subcontractors, and all other documents <br />required to be submitted with the bids. <br /> <br />1.3.16 Make a written recommendation to the City regarding award of bid; attend the pre- <br />bid conference and assist the City in answering all questions of prospective or potential <br />bidders and City's staff and make all necessary clarifications and interpretations of the <br />construction contract documents. <br /> <br />1.3.17 Have no authority to issue a Notice to Proceed to any Contractor. <br /> <br />1.4 PHASE 3 - CONSTRUCTION ADMINISTRATION <br /> <br />The Construction phase of this Project will commence with the award of the <br />construction contract and will terminate when the Project is accepted by the City. The <br />Engineer will: <br /> <br />1.4.1 Provide administration of the construction contract as set forth in the construction <br />documents unless otherwise provided in this Agreement and incorporated in the <br />construction contract documents. Engineer will not pursue a course of conduct which <br />might jeopardize any ofthe City's rights thereunder. Minor deviations from the construction <br />contract documents that do not affect the validity of performance bond(s) are permitted. <br /> <br />1.4.2 Be a representative but not an agent of the City during the construction phase, and <br />advise and consult with the City and provide progress reports and advice to the City in <br />writing; forward the City's instructions to the Contractor unless (1) Engineer is unavailable <br />by telephonic communication or otherwise to issue instructions necessary for the proper <br />progress and acceptance of work; (2) jeopardy to life and/or property exists; and/or (3) lack <br />of instructions and/or unavailability of Engineer will result in, in City's opinion, harm to City, <br />in which case instructions may be forwarded directly to the Contractor by the City; have <br /> <br />Dannenbaum2.wpd <br /> <br />5 <br />