Laserfiche WebLink
<br />Drive to River Road including: <br /> <br />(a) Roadway/Plan profile sheets. <br />(b) A drainage plan and calculations. <br />(c) Cross drainage plan/profile sheets. <br />(d) Storm water pollution prevention plan (SW3P). <br />(e) Striping plan. <br />(f) Waterline Plans to include: <br />(1) Plan and profile sheets at a scale of 1" = 20'. <br />(2) Fire hydrant and water valve adjustments. <br />(3) Standard and special details. <br />(4) General notes. <br />(g) Prepare plans for a gravity wastewater line along Davis Lane to include: <br />(1) Plan and profile sheets at a scale of 1 "=20'. <br />(2) Standard and Special details. <br />(3) General Notes. <br />(h) All required standard detail sheets. <br /> <br />1.3.2 Acquire TxDOT permit as required for construction. <br /> <br />1.3.3 Prepare any special details required for the Project. <br /> <br />1.3.4 Prepare six sets of review plans for City comment at 60% and 90% completion. At <br />90% completion, technical specifications and the bid form will be included for review. <br /> <br />1.3.5 Incorporate final review comments into design. <br /> <br />1.3.6 Prepare final quantities and cost estimate. <br /> <br />1.3.7 Prepare construction contract documents using forms supplied by the City based <br />on the approved design development documents and any further adjustments authorized <br />by the City in the scope, quality or budget of the Project. These contract documents will <br />include detailed plans and technical specifications required for the Project to be accurately <br />bid and efficiently constructed <br /> <br />1.3.8 Use its best professional judgment to create documents that comply with applicable <br />construction and development codes, local regulations and ordinances and other federal <br />and state regulations which are known or which should reasonably be known to the <br />Engineer. <br /> <br />1.3.9 Plot one set of final plans and be responsible for the printing and binding of 25 sets <br />of the bid documents. <br /> <br />1.3.10 Conduct in house Quality Control. <br /> <br />Dannenbaum2.wpd <br /> <br />4 <br />