My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-006
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2006 11:47:21 AM
Creation date
7/11/2006 10:53:18 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2005-6
Date
1/4/2005
Volume Book
160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />constructing the accessible trail system, entry drive and architectural elements <br />should be. An Integrated Design Process is also a key to the sustainability of the <br />park. Overall, the site design should be researched and employed to protect the <br />environment through a "low-impact" approach in all cases, but especially with regard <br />to the structures and facilities. Implementing best management practices with <br />respect to site sediment and erosion control, developing an effective stormwater <br />management system, and minimizing the size of the construction zone are all ways <br />in which the park design can be made more sustainable. Water and energy <br />conservation strategies should be pursued in the construction, maintenance, and <br />expansion of the park. The design of both indoor and outdoor spaces should <br />encourage flexibility, allowing programmatic requirements of the site rather than any <br />particular architectural aesthetic or ideal to dictate how the spaces are used. <br />Versatility, convertibility, and expandability of the park enhancement will all <br />contribute to the overall sustainability of the park. Finally, considerations of <br />maintenance should be balanced with the overall design aesthetic. <br /> <br /> <br />image 10 <br /> <br />.:. DESIGN PROCESS <br /> <br />The Purgatory Creek Master Plan and Design Guidelines were developed through a <br />design process including an environmental survey, site analysis, input from the City of <br />San Marcos Parks and Recreation staff and input from the public through meetings and <br />surveys. The environmental survey established locations of unique and sensitive natural <br />resources to be highlighted or in some cases protected. See separate report entitled <br />"Biological Survey, Geologic Assessment, & Hazardous Materials and Condition Review <br />for the Proposed Purgatory Creek Park" dated November 2003. Public meeting #1 was <br />held to introduce the project site and the site opportunities and constraints. In addition <br />public feedback on particular desires for the park was received at the meeting. A great <br />majority of the approximately fifty participants wished to preserve the parkland in its <br />current natural state while providing much needed recreational opportunities such as a <br />trail system and environmental education. <br /> <br />From the environmental survey and public input two master plans were developed. A <br />preferred Master Plan was then produced through meetings with the San Marcos Parks <br />and Recreation Department and the Parks Board. This preferred Master Plan was then <br /> <br />.. <br /> <br />Page 9 of 77 <br /> <br />Carter = Burgess <br />Hatch Partnership, LLP <br />Jankedesign <br />
The URL can be used to link to this page
Your browser does not support the video tag.