My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-012
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2006 3:20:18 PM
Creation date
7/11/2006 3:16:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
2005-12
Date
1/18/2005
Volume Book
160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 15.34 ProvIde to the CIty a complete, orgamzed set ofproJect documents and records. <br /> <br />1 15.35 RevIse the ongma1 desIgn drawmgs to reflect aVailable record mformatIOn <br />provIded by the Contractor and eqUIpment supplIers. The Engmeer WIll submIt one <br />reproducible set and three hard copIes to the City The Engmeer IS not responsible for any <br />errors or omISSIOns m the mformatIon from others that IS mcorporated mto the record <br />drawmgs. <br /> <br />1 15.36 Develop one OperatIOns and Mamtenance (O&M) manual describmg the <br />operatIOn of the Project faCIlItIes and systems assOCIated WIth BIOlogIcal Phosphorous <br />Removal. ThIS manual WIll focus on the vanous pnmary modes of operatIon that may be <br />used, mcludmg both normal operatIOn and mltIal emergency operatIOn procedures. The <br />manual WIll explam the purpose and baSIC concept of the vanous processes that are <br />mcorporated mto the overall plant. Where appropnate, reference WIll be made to the <br />manufacturer's detailed O&M submIttals. The manual WIll mclude mstructIOns for <br />process operatIOns and test or laboratory procedures that may be reqUIred to mom tor the <br />performance of the faCIlItIes. The manual WIll be SUItable for use as an operatIOnal tool <br />and to faCIlItate operator trammg. Three copIes of the O&M manual WIll be submItted to <br />the City <br /> <br />1 15 37 PrOVIde warranty performance reVIew servIces dunng the one-year warranty <br />penod to aSSIst the City m coordmatmg correctIOns of defiCIent eqUIpment or <br />constructIOn. As part of these servIces, the Engmeer WIll make one SIte VISIt dUrIng the <br />warranty perIod to mom tor contract defiCIenCIes m workmanshIp, matenals or eqUIpment <br />and prepare correspondence mformmg the Contractor of such defiCIenCIes. <br /> <br />1 15.38 One month prIor to the end of the one year warranty penod, reVIew the completed <br />Project WIth the City and the Contractor, prOVIde a letter IdentIfymg any defiCIenCIes <br />found and recommended actIons, and have all defiCIent Items corrected. The extent of the <br />dutIes, responsibIlItIes and lImItatIOns of authonty of the Engmeer as the CIty'S <br />representatIve dUrIng constructIOn WIll not be modIfied or extended after the constructIOn <br />contract documents have been authOrIzed by the CIty to be competItIvely bId WIthout <br />WrItten consent of the CIty and the Engmeer and WIth notIce to the Contractor <br /> <br />1 1539 Coordmate WIth the Contractor the trammg servIces of qualIfied representatIves <br />from eqUIpment manufacturers relatIve to operatIon, mamtenance and testmg of the <br />eqUIpment proVIded for the ProJect. The Engmeer WIll prOVIde supplemental classroom <br />mstructIOns to the CIty'S staff COverIng both the baSIC operatIOnal concept and actual <br />operatIOn of the systems and components under both normal and abnormal operatIOns that <br />are likely to occur, If requested. If requested by the CIty, the Engmeer WIll focus on <br />classroom trammg seSSIOns WIth a total duratIOn of approXImately 20 hours dIrected at <br />bIOlogIcal phosphorous removal and odor control faCIlItIes. <br /> <br />1 15 40 Work WIth the operatIOns staff of the WWTP to IdentIfy warranty claims and <br />performance Issues, and develop a plan of correctIve actIOns. <br /> <br />10 <br /> <br />CH2M Hill WWTP Amdmt 1 1-18-05 (4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.