Laserfiche WebLink
<br />obtam wntten plans from the Contractor for qualIty control of Its work, and wIll momtor <br />the Contractor's complIance wIth these plans. <br /> <br />1 15.27 ReqUIre the submIssIOn by the Contractor of pen OdIC wage rate payment reports <br />for all employees of the Contractor and of subcontractors performmg work on the Project, <br />and, wIth the CIty'S assIstance, venfy complIance wIth federal and state wage rate <br />reqUIrements for the Project; and notIce the CIty of any noncomplIance, or of the faIlure <br />by the Contractor to make submIssIOns. <br /> <br />1 15.28 RevIew all claIms, notIces and dIspute letters receIved by the City, and discuss <br />them with the Contractor as necessary to understand each such claIm or dIspute The <br />Engmeer wIll advIse the City regardmg the Contractor's complIance wIth the contract <br />reqUIrements for such claIms and dIsputes. The Engmeer wIll assIst the CIty m <br />dIScuSSIons wIth the Contractor to resolve claIms and dIsputes. The Engmeer wIll not <br />Issue declSlons on Contractor claIms or dIsputes. Engmeer wIll not, except as part of <br />AdditIonal ServIces, undertake comprehensIve and detaIled mvestIgatIOn or analysIs of <br />claIms and dIsputes, or partIcIpate m JudIcIal or alternatIve dIspute resolutIOn procedures <br />for the claIms or dIsputes. <br /> <br />1 15.29 NotIfy the City and the Contractor If the Engmeer observes that any notIces and <br />SIgnS reqUIred or provIded by the CIty are not posted m the appropnate locatIOns at the <br />Project sIte by the Contractor <br /> <br />1 15 30 ASSISt the CIty WIth mspectIOns at substantIal and final completIOn m accordance <br />with the constructIOn contract documents. The Engmeer wIll conduct final mspectIOns <br />with the City, and prepare up to two separate punch lIsts of Items requmng completIOn or <br />correctIOn pnor to final acceptance by the City The Engmeer will make <br />recommendatIOns to the CIty regardmg acceptance of the work based upon the results of <br />the final mspectIOn. <br /> <br />Prol ect Close-Out <br /> <br />115.31 AssIst the CIty m closmg out the constructIOn contract and commencement of <br />the City's use of the completed Project. The Engmeer wIll aSSIst the CIty m Issumg <br />documents for substantIal completIOn and acceptance of the work, adVIse the City on <br />payment and any requested partIal release of the Contractor's retamed compensatIOn, <br />aSSIst the City m Issumg documents for final completIOn and acceptance of the Project, <br />and adVIse the CIty on final payment, release of retentIOn, and release of msurance and <br />bonds. <br /> <br />1 1532 Coordmate WIth the Contractor for the submIssIOn of reqUIred manuals prOVIded <br />by eqUIpment supplIers for operatIon and mamtenance and for trammg of the CIty staff. <br /> <br />1 15.33 Coordmate WIth the Contractor for the submIssIOn of reqUIred warrantIes, <br />guarantees, lIen releases and other sImIlar documents as reqUIred by the constructIOn <br />contract. Engmeer wIll adVIse the CIty as to the acceptabIlIty and complIance of these <br />documents WIth the constructIOn contract. <br /> <br />9 <br /> <br />CH2M Hill WWTP Amdmt 1 1-18-05 (4) <br />