My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-012
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2006 3:20:18 PM
Creation date
7/11/2006 3:16:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
2005-12
Date
1/18/2005
Volume Book
160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3 ConstructIOn or eqUIpment related fmlures. <br /> <br />4 Force majeure events, such as power blackouts or exceSSIve ramfall. <br /> <br />Because of the eXlstmg Issues WIth odor control and nelghbonng commumtIes, the <br />Engmeer does not guarantee that odor complamts wIll stop However, the odor control <br />eqUIpment manufacturer has warranted the performance for theIr eqUIpment under the <br />desIgn condItIOns <br /> <br />ThIS Process Guarantee IS effectIve for five years from substantIal completIOn of the <br />facIlIty Engmeer wIll perform evaluatIOns at the request of CIty dunng the Process <br />Guarantee penod and wIll correct performance problems m accordance wIth the terms <br />outlmed wlthm thIS SubsectIOn I I 7 <br /> <br />In connectIOn wIth any request by the CIty to the Engmeer to evaluate a performance <br />problem, the Engmeer wIll, before beglnnmg the evaluatIOn, proVIde the CIty wIth a <br />prelImmary scope of servIces, tIme lme, and cost estImate for the evaluatIOn, WhICh WIll <br />be subject to reVIew and approval by the CIty <br /> <br />In the event the Engmeer's evaluatIOn determmes the problem to be caused wholly by one <br />or more of the Items lIsted m I - 4 above m thIS SubsectIOn I I 7, CIty shall compensate <br />Engmeer for the evaluatIOn as an "AddItIonal ServIce" and m accordance wIth the <br />"AddItIOnal ServIces" compensatIOn terms of thIS Agreement. The budget allocated by <br />thIS Agreement for "AddItIOnal ServIces" shall be appropnately mcreased, as reqUIred, to <br />compensate for such evaluatIOns. <br /> <br />2) Delete the current SectIOn 1 14 m ItS entIrety and substItute m ItS place the followmg: <br /> <br />114 TASK 13 - HYDRAULIC AND PROCESS MODELING AND DESIGN OF <br />HEADWORK EXPANSION AND PIPING MODIFICATIONS AND <br />INTEGRATION INTO EXISTING DESIGN <br /> <br />The Engmeer WIll <br /> <br />1 14 1 Perform hydraulIc and process modelIng to IdentIfy potentIal aeratIOn basm and <br />secondary clanfier modIficatIOns that may mcrease hydraulIc and/or process capaCIty <br />The Engmeer WIll evaluate three scenanos mcludmg: <br /> <br />a) ExpanSIOn of aeratIon basms by approxImately 15% fill m "notched" <br />comer; use of two eXlstmg secondary clanfiers. <br />b) AeratIOn basm as m Scenano 1, add thIrd secondary clanfier <br />c) Expand aeratIOn basm capaCIty to match hydraulIc and process capaCItIes <br />assocIated WIth addItIon ofthlrd clanfier <br /> <br />For each scenano evaluated, the Engmeer wIll develop a prelImmary opmIOn of costs to <br />faCIlItate the determmatIOn of the benefit of each of the mdlvldual scenanos m terms of <br /> <br />2 <br /> <br />CH2M Hill WWTP Amdmt I 1-18-05 (4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.