My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-012
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2006 3:20:18 PM
Creation date
7/11/2006 3:16:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
2005-12
Date
1/18/2005
Volume Book
160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />hydrauhc or process capacIty versus constructIOn cost. Upon completIOn of thIS task the <br />Engmeer WIll delIver to the CIty a wntten opmIOn report. <br /> <br />1 14.2 DesIgn an expanded headwork facIlIty and pIpmg modIficatIOns to allow for <br />greater hydraulIc capacIty Engmeer wIll mclude m the pIpmg modIficatIOns the <br />parallelmg of mam wastewater pIpelme between the headworks and the pnmary clanfier <br />dIstributIOn box and parallelmg of the Secondary Clanfier No 2 effluent lme The <br />Engmeer wIll mtegrate these addItional desIgn components mto the eXIstmg on-gomg <br />desIgn to produce one constructIOn document package <br /> <br />3) Delete current SectIOn 1 15, AddItional ServIces, and add a new SectIOn 1 15, BIddmg and <br />ConstructIOn AdmmIstratIOn, as follows <br /> <br />1.15 TASK 14 - BIDDING AND CONSTRUCTION ADMINISTRATION <br /> <br />The ConstructIOn Phase of thIS Project wIll commence WIth the award of the constructIOn <br />contract and wIll termmate when the Project IS finally completed and accepted by the <br />City <br /> <br />The Engmeer wIll <br /> <br />BIddmg <br /> <br />.. <br /> <br />1 15 1 Be responsible for the pnntmg and bmdmg of 46 sets of bId documents at no <br />addItional charge to the CIty, after the CIty approves the constructIOn contract documents <br />and the Engmeer's latest detailed final cost estimate for the Project. <br /> <br />1 15.2 ASSISt the CIty m the dIstribution of the bId documents to prospective bIdders and <br />to plan rooms, and the Issuance of addenda (if any) after obtammg the CIty'S approval. <br /> <br />1 15 3 ASSISt the CIty m conductmg a pre-bId conference, and answer all questIOns of <br />potential bIdders and the City staff, and make all necessary clanficatIOns and <br />mterpretatIOns of the constructIOn contract documents after obtammg the CIty'S approval. <br /> <br />1 15 4 ASSISt the CIty m obtammg bIds, tabulatmg bIds, prepanng bId tabulatIOn forms, <br />and m awardmg the constructIOn contract. <br /> <br />1 15 5 ASSISt the CIty m revIewmg the bIds, mcludmg the Statements of BIdder's <br />QualIficatIOns, financial statements, lIsts of proposed subcontractors, and all other <br />documents reqUired to be submItted wIth the bIds, and make a wntten recommendatIOn to <br />the CIty regardmg award of bId. <br /> <br />1 15 6 Have no authonty to Issue a NotIce to Proceed to any contractor <br /> <br />ConstructIOn AdmInIstratIOn <br /> <br />3 <br /> <br />CH2M Hill WWTP Amdmt 1 1 18-05 (4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.