My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-012
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2006 3:20:18 PM
Creation date
7/11/2006 3:16:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Amendment
Number
2005-12
Date
1/18/2005
Volume Book
160
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 15 7 ProvIde admmIstratIOn of the constructIOn contract as set forth m the constructIOn <br />documents unless otherwIse provIded m thIS Agreement and mcorporated m the <br />constructIOn contract documents. Engmeer will not pursue a course of conduct WhICh <br />mIght JeopardIze any of the CIty'S nghts thereunder Minor deViatIOns from the <br />constructIOn contract documents that do not affect the valIdIty of performance bond(s) are <br />permItted. <br /> <br />1 15 8 EstablIsh a system and set of procedures for 10ggmg, managmg, trackmg and <br />stonng of all relevant correspondence and documents, RFI and Change Orders between <br />the Contractor, Engmeer and CIty that are produced dunng the BId/Award, ConstructIOn <br />and Close-out phases of the project. Engmeer WIll utIlIze an appropnate computer-based <br />document management system selected by Engmeer The Engmeer WIll, m coordmatIOn <br />WIth the CIty, mamtam hard copy records, sUItably orgamzed, of all relevant <br />documentatIOn. The Engmeer wIll assIst the CIty m momtonng all outstandmg decIsIOns, <br />approvals or responses reqUIred from the Engmeer or the CIty The Engmeer wIll reVIew <br />each request for mformatIOn, mterpretatIOn and clanficatIOn of the constructIon contract <br />documents ("RFI") submItted by the Contractor, wIll coordmate as needed wIth the City, <br />and wIll Issue a response to the Contractor The Engmeer assumes that 120 RFIs wIll be <br />submItted by the Contractor The Engmeer WIll reVIew each request of the Contractor for <br />substItutIOn of matenals and eqUIpment, wIll reVIew the request and WIll advIse the City <br />as to the acceptabIlIty of such substItutIOns, and wIll Issue a response to the Contractor <br /> <br />1 15 9 Be a representatIve but not an agent of the CIty dunng the constructIOn phase, and <br />advIse and consult wIth the CIty and prOVIde progress reports and advIce to the CIty m <br />wntmg; forward the CIty'S mstructIons to the Contractor unless (1) the Engmeer IS <br />unaVailable by telephomc commumcatIon or otherwIse to Issue mstructIOns necessary for <br />the proper progress and acceptance of work; (2) jeopardy to lIfe or property eXIsts, or (3) <br />lack of mstructIOns or unaVailabIlIty of the Engmeer wIll result, m the CIty'S opmIOn, m <br />harm to the City, m WhICh case mstructIOns may be forwarded dIrectly to the Contractor <br />by the CIty; and have authonty to act on behalf of the CIty only to the extent prOVIded <br />herem and m the constructIOn contract documents, unless otherwIse modIfied by wntten <br />mstrument m accordance wIth SectIOn 12 1 Any mstructIons Issued dIrectly by the City <br />to the Contractor WIll be promptly commumcated to the Engmeer If the Engmeer was <br />unavaIlable at the tIme of Issuance of the mstructIOns. The Engmeer wIll Implement and <br />mamtam regular communIcatIOns WIth the Contractor dunng the constructIOn. The <br />Engmeer WIll receIve and log all commumcatIOns from the Contractor, and WIll <br />coordmate the commumcatIOns between the City and the Contractor The Engmeer wIll <br />not commumcate dIrectly wIth the Contractor's subcontractors. <br /> <br />1 15 10 Conduct a pre-constructIOn conference wIth the Contractor, members of the City <br />staff (mcludmg CIty mspectors), representatIves of affected utIlIty prOVIders, and federal <br />and state agenCIes havmg jUnSdIctIOn over the Project, m order to establIsh constructIOn <br />schedules and to IdentIfy key representatIves of the partIes and lInes of commumcatIOn. <br /> <br />1 15 11 ASSISt the CIty m ensunng that all applIcable permIts and approvals have been <br /> <br />4 <br /> <br />CH2M Hill WWTP Amdmt 1 1-18-05 (4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.