Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />representatIves. The Consultant wIll meet WIth the ProJect team to set the desIgn and productIon <br />schedule and parameters for all subsequent work, to venfy the components wlthm WhICh all <br />ProJect partIcIpants must perform, and to IdentIfy all partIes and sIgnIficant deadlmes mvolved m <br />the comprehensIve schedule strategy Based on thIS mformatIon, the Consultant WIll prepare a <br />detailed schedule of ItS work for the ProJect addressmg each component of the work to be done, <br />mdlcatmg the pomts of mvolvement of all proJect partIcIpants. The Consultant WIll conduct <br />weekly progress meetmgs between the ProJect team and the Contractor once the constructIOn <br />contract IS executed. <br /> <br />1 44 ASSISt the CIty m connectIon WIth the CIty'S responsibIlIty for filmg documents reqUIred <br />for the approval of governmental authontIes havmg JunsdICtIon over the ProJect m addItIon to <br />the Consultant's responsibIlIty for ADA reVIew as specIfied m SubsectIOn 1 67 of thIS <br />Agreement. <br /> <br />1.5 TASK 4 - RAILROAD APPROV AL/TXDOT REVIEW <br /> <br />The Consultant WIll <br /> <br />1 5 1 Meet wIth UP to obtam standard specIficatIons and reqUIrements for pedestnan crossmgs <br />One meetmg wIth UP IS mcluded m thIS Agreement. <br /> <br />1 5.2 SubmIt prelImmary plans to UP to obtam approval of the prelImmary desIgn. <br /> <br />1 5 3 Meet wIth TxDOT offiCIals to obtam approval for constructIOn of SIdewalks along <br />TxDOT nghts-of-way The Consultant's formal submIssIOn of plans to TxDOT IS not mcluded <br />m thIS Agreement. <br /> <br />1 6 TASK 5 - FINAL DESIGN <br /> <br />The Consultant wIll <br /> <br />1 6 1 Upon the CIty'S approval of the prehmmary engmeenng report, finahze deSIgn <br />documents to mclude final refinement of the SIdewalk desIgn plans, erosIOn control, protectIon, <br />traffic control (If necessary) and all constructIon detaIls reqUIred to complete the ProJect. <br /> <br />1 6.2 DesIgn accessible ramps at all mtersectIons and desIgn tranSItIons for all dnveways <br />mcluded m the ProJect area. <br /> <br />1 6 3 SIze pIpes or culverts crossmg swales, based on eXlstmg open channel flow capacIty <br />The Consultant WIll calculate the flow usmg the ratIOnal method and WIll determme dramage <br />areas usmg topography maps provIded by the CIty Consultant's desIgn of a bndge and <br />assocIated abutments, If reqUIred, wIll be consIdered an addItIonal servIce. <br /> <br />I 1 64 Meet Wlth the City's Project Manager penodlcally or as needed to update the City on the <br /> <br />4 <br />