ATTACHMENT A <br />SCOPE OF SERVICES <br />FRANKLIN LIFT STATION FORCE MAIN EXTENSION <br />c. Attend bid - opening, prepare bid tabulation and issue a recommendation <br />for award. KFA will attend the public bid opening. After receipt of bids, <br />KFA will tabulate the bids in unit price format. KFA will evaluate the bids <br />for responsiveness, meet with the low bidder if necessary, and issue a <br />recommendation of award to the City of San Marcos. <br />PHASE III — CONSTRUCTION PHASE SERVICES <br />KFA will assist the City of San Marcos with contract administration during the <br />construction phase of the project. We understand the City of San Marcos will <br />provide construction inspection services, and have assumed that the construction <br />duration will be approximately 3 months. KFA's services will include: <br />Attend pre - construction conference. KFA will attend a pre - construction <br />conference with the City of San Marcos, Contractor, and other parties as <br />appropriate, and prepare the meeting minutes. <br />2. Attend regular construction meetings. KFA will attend regular construction <br />meetings with the City of San Marcos, Contractor, and other parties as requested <br />by the City, including preparing the meeting minutes. For budgeting purposes we <br />have assumed 3 meetings. Site visits will take place during these construction <br />meetings, no separate site visits are included. <br />3. Submittal Review. KFA will maintain a log of all Contractor submittals, track <br />review progress, review and approve submittals, and distribute submittals to the <br />appropriate parties. <br />4. Preparation of Change Orders. KFA will prepare Change Orders as requested <br />by the City. For budgeting purposes we have assumed two (2) change orders. <br />5. Provide answers to requests for information (RFI's) from Contractor as related to <br />possible conflicts and clarifications needed between plans and specifications. <br />Two (2) RFI's have been assumed. <br />6. Contract Close -out. KFA will attend a final project walk -thru, document "punch <br />list items ", and issue recommendation of substantial and final completion. KFA <br />will also notify TCEQ and other jurisdictional agencies of project completion. <br />7. Record Drawings. KFA will use the Contractor's redline as -built drawings to <br />document as -built conditions in the final record drawings. KFA will supply the <br />City of San Marcos with one set of reproducible record drawings and provide one <br />set of record drawings in electronic format. <br />8/24/2011 Attachment A- Page 4 of 4 0 F R I ES E <br />& ASSOCIATES, INC. <br />