Section 6.08. If City opts to perform Make -Ready Work and Licensee has not pre -paid the City for <br />Make -Ready Work associated with an Application, then upon completion of the Make -Ready Work, <br />the City will bill the Licensee for all costs of the work. The City will issue a Permit only after the <br />Licensee pays the City all fees and for the cost of all Make -Ready Work associated with the Permit. <br />The Licensee may proceed to make the Attachments covered by the Permit only after the Permit is <br />issued. <br />Section 6.09. If the Licensee does not make the Attachments authorized by a Permit within 60 days <br />of the issuance of the Permit, the City may revoke the permit in accordance with Section 12.02. In <br />such instances, the City will endeavor to make other space available to the Licensee, upon written <br />request, as soon as reasonably possible. <br />ARTICLE 7. MAKE -READY WORK/INSTALLATION OF ATTACHMENTS BY <br />LICENSEE <br />Section 7.01. In the event the City determines that Make -Ready Work is necessary to accommodate <br />Attachments for which the Licensee has applied for a Permit and City opts to perform the Make - <br />Ready Work, the City will advise the Licensee of the estimated costs of the Make -Ready Work. The <br />time frame for Make -Ready Work performed by City for Attachments within the communications <br />space is 148 days (178 days for pole -top). <br />• Survey — 45 days. During the 45 -day survey phase, City will conduct a Pre - Permit Survey to <br />determine whether and where attachment is feasible, and what make -ready is required. <br />• Estimate — 14 days. City provides an estimate of the make -ready charges within 14 days of <br />receiving the results of the Pre - Permit Survey. <br />• Licensee Acceptance — 14 days. Licensee has up to 14 days to approve the estimate. <br />• Make - Ready /Communications Space — 60 days. City must notify any attachers with <br />facilities already on the pole that make -ready for a new attacher needs to be performed within <br />60 days. <br />• Make - Ready /Pole -Top — 90 days. City must notify any attachers with facilities already on <br />the pole that make -ready for a new attacher needs to be performed within 90 days. <br />Section 7.02. The City at its discretion may require prepayment of the estimated cost of Make - <br />Ready Work to be performed by City or its contractor. When prepayment is not required by the City, <br />the Licensee will pay the City's actual cost of the Make -Ready Work performed by City or its <br />contractor upon completion and before the Permit is issued. Make -Ready Work performed by <br />Licensee will be at Licensee's expense. <br />Section 7.03. Unless the City specifically determines otherwise in connection with a particular <br />Application, all Make -Ready Work will be performed only by the City or by a contractor authorized <br />and approved by the City to perform the work. <br />9 <br />CADocuments and Settings \tamara.slade \Local Settings \Temporary Internet Files \Content.Outlook \F3JWG5DH \San Marcos <br />PAA FINAL CLEAN 10172011.docx <br />