My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2005-190
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2005
>
Res 2005-190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2006 2:59:06 PM
Creation date
7/21/2006 2:58:36 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2005-190
Date
12/14/2005
Volume Book
164
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />2.5 NegotIate and obtam executed easements from property owners If necessary <br /> <br />2.6 ProvIde access to and make all necessary prOVISIOns for the Engmeer to enter publIc and <br />pnvate property as reqUIred for the Engmeer to perform Its servIces under thIS Agreement. <br /> <br />2.7 Locate and expose pIpmg IdentIfied by Engmeer to obtam field mformatIOn, If necessary <br /> <br />2.8 Be responsible for the cost ofpnntmg and bmdmg of the bId documents. <br /> <br />2.9 Bear all costs mCIdent to thIS ArtIcle. <br /> <br />ARTICLE 3 <br />CONSTRUCTION COST <br /> <br />3 1 DEFINITION <br /> <br />3 lIThe constructIOn cost WIll be the total cost or estImated cost to the CIty of all elements of <br />the ProJect deSIgned or speCIfied by the Engmeer <br /> <br />3 1.2 The constructIOn cost WIll mclude at current market rates, mcludmg a reasonable <br />allowance for overhead and profit, the cost of any eqUIpment whIch has been deSIgned, speCIfied, <br />selected or speCIally prOVIded for by the Engmeer, except that used matenals and eqUIpment WIll <br />be mcluded as If purchased new for the ProJect. <br /> <br />3 1 3 ConstructIOn cost does not mclude the compensatIOn of the Engmeer and the Engmeer's <br />subconsultants, or other costs WhICh are the responsibIlIty of the CIty as prOVIded m ArtIcle 2 <br /> <br />3.2 RESPONSIBILITY FOR CONSTRUCTION COST <br /> <br />3.2 1 EvaluatIons of the CIty'S ProJect budget and detailed cost estImates, If any, prepared by <br />the Engmeer, wIll represent the Engmeer's best Judgment as a deSIgn profeSSIOnal famIlIar WIth <br />the constructIOn mdustry <br /> <br />3.2.2 A fixed lImIt of constructIOn cost for thIS ProJect WIll be establIshed by the CIty'S <br />representatIve after consultmg WIth the Engmeer The Engmeer WIll be permItted to mclude <br />contmgencIes for deSIgn, bIddmg and pnce escalatIOn, to determme what matenals, eqUIpment, <br />and types of constructIOn are to be mcluded m the constructIOn contract documents, to make <br />reasonable adJustments m the scope of the ProJect and to mclude m the constructIOn contract <br />documents alternate bIds to adJust the constructIOn cost to the fixed lImIt. The fixed lImIt of <br />constructIon cost may be mcreased by the CIty <br /> <br />3.23 If the lowest bona fide bId exceeds the Engmeer's most recent approved cost estImate <br />establIshed as a condItIon of thIS Agreement, the City WIll (1) gIVe wntten approval of an <br />mcrease m such fixed lImIt, (2) authonze rebIddmg of the ProJect wIthm a reasonable tIme, or (3) <br />cooperate m revlSlng the ProJect scope and qualIty to reduce the constructIOn cost. Dunng the <br />development of the ProJect through the phases described by ArtIcle 1 of thIS Agreement and <br /> <br />APA! "lurface Water Expansion <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.