Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />acceptance of wntten matenals prepared by the Engmeer and/or Its subconsultants, contractors, <br />and subcontractors m connectIOn wIth thIS Agreement WIll not dImIlllsh the Engmeer's <br />responsibIlIty for the matenals. <br /> <br />1 1 6 The City has contracted wIth the Guadalupe Blanco RIver Authonty ("GBRA" or the <br />"Operator") for operatIon of the City's Surface Water Treatment Plant. Engmeer wIll perform <br />all of ItS servIces m coordmatIOn WIth the CIty and the Operator <br /> <br />1.2 PHASE 1- PRELIMINARY DESIGN <br /> <br />The Engmeer WIll <br /> <br />1.2 1 Develop a wntten program for the ProJect to ascertam the CIty'S and the Operator's needs <br />and to establIsh the reqUIrements for the ProJect. <br /> <br />1.2.2 ProvIde a prelImmary evaluatIOn of the ProJect, constructIOn schedule and constructIOn <br />budget reqUIrement, each m terms of the other <br /> <br />1.2 3 ReVIew WIth the CIty and the Operator the alternatIve approaches to deSIgn and <br />constructIon of the ProJect. <br /> <br />1.2 4 Attend a kickoff meetmg m San Marcos WIth the CIty and the Operator to dISCUSS the <br />ProJect approach, schedule, and Issues IdentIfied as well as alternatIves aVailable, constructIon <br />sequence, and related Issues. <br /> <br />1.2 5 Perform water qualIty modelmg for the CIty'S dIstributIOn system usmg the CIty'S eXIstmg <br />water dIstributIOn system model to estImate trihalomethanes ("THM") and halo acetIc aCId <br />("HAA") mformatIOn based on system water age. In addItIon, the Engmeer WIll also mvestIgate <br />the potentIal for llltnficatIon and corrOSIOn Issues m the dIstributIOn system. The Engmeer's <br />evaluatIOn wIll meet the reqUIrements of the Draft IllltIal DIstributIOn System EvaluatIOn <br />("IDSE") GUIdance Manual of the EnVIronmental ProtectIon Agency ("EP A") PreparatIOn of <br />the IDSE report IS not mcluded. The Engmeer WIll also evaluate the proposed GBRA system to <br />determme If chlorammes may be necessary for dIsmfectIOn to reduce THM and HAA formatIOn. <br />The Engmeer wIll perform one total tn-halomethanes ("TTHM") potentIal test on the filllshed <br />water to use m evaluatmg the THMIHAA potentIal m the San Marcos dIstributIOn system or the <br />GBRA transmISSIOn system. If It IS determmed by the Engmeer that modIficatIOns to the <br />dIsmfectIOn protocols are reqUIred, the Engmeer wIll IdentIfy Improvements that WIll need to be <br />made at the CIty's well sources, m addItIon to the well sources of GBRA customers. <br /> <br />1.2 6 Prepare for CIty and Operator's approval, a PrelImmary DeSIgn Memorandum conSIstIng <br />ofprelImmary deSIgn calculatIOns for chemIcal feed rates (Powdered ActIvated Carbon ["PAC"], <br />fluonde, chlonne, sodmm chlonde, and also for LIqUId Ammolllum Sulfate ["LAS"]), hydraulIc <br />profiles, prelImmary process and mstrumentatIOn dIagrams ("P&ID") of each eqUIpment system, <br />prelImmary layout drawmgs for the clanfiers, filters, hIgh servIce pumps, clearwell, sludge <br />ponds, and chemIcal feed areas, and a ProJect ImplementatIon schedule In addItIon, the <br />Engmeer WIll reVIew the Plant control system to determme whether upgrades m the control <br /> <br />,PAl S lrface W lter Expansion <br /> <br />2 <br />