Laserfiche WebLink
<br />1-- <br /> <br />I <br /> <br />system or software are advIsable. The Engmeer wIll furnIsh SIX copIes of any memorandum the <br />Engmeer generates to the CIty and Operator for reVIew The final memoranda wIll be <br />transmItted electrolllcally m pdf format. <br /> <br />1.2 7 SubmIt to the CIty and Operator an OpmIOn of Probable ConstructIOn Cost based on <br />current area, volume or other Ulllt costs and WhICh mdIcates the cost of each category of work <br />mvolved m constructmg the ProJect. <br /> <br />1.2 8 Update CT Study and Chlonne DIOXIde System EvaluatIon, assess the chlonne dIOXIde <br />system capaCIty and calculate the CT capabIlIty m the raw water pIpelme In addItIon, the <br />Engmeer WIll prepare a memorandum IdentIfymg alternatIves and makmg recommendatIons on <br />modIficatIOns and addItIonal eqUIpment, mcludmg any modIficatIons that mIght need to be made <br />at the eXIstmg well SItes to mamtam compatibIlIty <br /> <br />1.2 9 IdentIfy a backup dIsmfectIOn approach for emergency SItuatIOns, such as usmg chlonne <br />through the clearwell(s), and determme the flow condItIons It IS applIcable under <br /> <br />1.2 10 IdentIfy WhICh parameters or deVIces should have alarms and WhICh should be mOllltored <br />VIa the SupervISory Control and Data AcqulSltIOn ("SCADA") System. <br /> <br />1.2 11 Perform CT calculatIOns for the Plant and the raw water pIpelIne and submIt to the Texas <br />CommISSIOn on EnVIronmental QualIty ("TCEQ") and IdentIfy any modIficatIOns to be deSIgned. <br /> <br />I <br /> <br />1.2 12 PartICIpate m one meetmg m San Marcos to dISCUSS comments regardmg the ProJect and <br />the deSIgn memorandum, and hold two qualIty control reVIew meetmgs at the Engmeer's Austm <br />office to dISCUSS the proJect. ProVIde SIX (6) copIes each of pertment documents to City and <br />Operator five (5) days pnor to each meetmg. <br /> <br />1.2 13 Incorporate comments and prepare a draft PrelImmary DeSIgn Memorandum for <br />submISSIOn to the CIty and Operator wIthm 6 weeks of the executIOn of thIS Agreement. <br /> <br />1.2 14 The Engmeer WIll assemble a ProJect team compnsed of the CIty'S representatIves, the <br />Operator's representatIves and the Engmeer's representatIves. The Engmeer WIll meet WIth the <br />ProJect team to set the deSIgn and productIOn schedule and parameters for all subsequent work, <br />to venfy the components wIthm WhICh all ProJect partICIpants must perform, and to IdentIfy all <br />partIes and SIgnIficant deadlInes mvolved m the comprehenSIve schedule strategy Based on thIS <br />mformatIon, the Engmeer wIll prepare a detaIled schedule of ItS work for the ProJect addressmg <br />each component of the work to be done, mdIcatmg the pomts of mvolvement of all ProJect <br />partICIpants. The Engmeer WIll conduct weekly progress meetmgs between the ProJect team and <br />the Contractor once the constructIOn contract IS executed. <br /> <br />1.3 PHASE 2 - DETAILED DESIGN <br /> <br /> <br />I The EngIneer Will <br /> <br /> <br />1 3 1 Meet WIth the CIty'S representatIve penodIcally or as needed to update the CIty on the <br /> <br />APAI Surface Water EKpansion <br /> <br />3 <br />