Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />1 4 17 Prepare mmor changes m the plans and specIficatIOns as duected by the CIty; and prepare <br />necessary change orders m tnplIcate ongmals for approval by the CIty and executIon m <br />accordance wIth the constructIon contract documents. Engmeer wIll not Issue change orders not <br />prevIOusly approved m wntmg by City, and no course of conduct on the part of Engmeer or City <br />wIll amend, Waive or alter thIS prOVISIOn. <br /> <br />1 4 18 Conduct profeSSIOnal mspectIOns to determme the dates of substantIal completIon and <br />final completIOn for the ProJect, to evaluate the work for acceptable conformance wIth the <br />constructIOn contract documents and m lIght of any subsequent tests performed as described m <br />SubsectIOn 1 4 14 to venfy that any mmor deVIatIons from the constructIon contract documents <br />as described m SubsectIOn 1 4 14 have been corrected and that the reasons for any speCIfic <br />qualIficatIons m any and all prevIOUS certIficates for payment as described m SubsectIon 1 4 14 <br />hereof are eIther no longer valId or the condItIon(s) and/or problem(s) have been corrected, wIll <br />receIve and reVIew wntten warrantIes and related documents reqUIred by the constructIon <br />contract documents and assembled by the Contractor; WIll Issue final certIficates for payment or <br />take other appropnate actIOn, and WIll make a wntten recommendatIOn to the CIty regardmg <br />CIty'S acceptance of the ProJect. <br /> <br />1 4 19 ReqUIre the submISSIOn by the Contractor, and subcontractors performmg work on the <br />ProJect SIte, of penodIc wage rate payment reports and aSSIst the CIty m venfymg complIance <br />WIth federal and state wage rate reqUIrements for the ProJect; and notIfy the City of any <br />noncomplIance, or of the failure by the Contractor or subcontractor's to make submISSIOns. <br /> <br />1 4.20 Prepare, or cause to be prepared, and submIt to the CIty a set of reproducible record <br />drawmgs showmg SIgnIficant changes m the work made dunng the constructIon phase <br /> <br />1 4.21 ASSISt the City m ensunng that all notIces and SIgnS reqUIred and prOVIded by the City are <br />posted m the appropnate locatIons at the ProJect SIte by the Contractor <br /> <br />1 4.22 Conduct final mspectIOn WIth the CIty and prepare a punch lIst prIor to final acceptance <br />by the City <br /> <br />1 4.23 The extent of the duties, responsibIlItIes and lImItations of authonty of the Engmeer as <br />the City's representatIve dunng constructIOn wIll not be modIfied or extended after the <br />constructIon contract documents have been authonzed by the CIty to be competItIvely bId <br />WIthout wntten consent of the CIty and the Engmeer and WIth notIce to the Contractor <br /> <br />1.5 PHASE 4 - STARTUP ASSISTANCE AND WARRANTY SERVICES <br /> <br />The Engmeer wIll <br /> <br />1 5 1 ASSISt the CIty and the Operator dunng the startup of new eqUIpment and prepare an <br />operatIon and process descnptIOn memorandum for the modIfied faCIlItIes. <br /> <br />1 5.2 Make five (5) SIte VISItS dUrIng the startup penod to observe performance, partICIpate III <br />meetmgs to IdentIfy and/or to resolve Issues and aSSIst m troubleshootmg. ThIS task mcludes 50 <br /> <br />APAI Surface Water EKpansion <br /> <br />8 <br />