My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2000-139
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2000
>
Res 2000-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2006 10:46:56 AM
Creation date
7/24/2006 10:46:27 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2000-139
Date
7/10/2000
Volume Book
141
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3.2.1 Evaluations of the City's Project budget and detailed cost estimates, if any, prepared <br />by the Architect, will represent the Architect's best judgment as a design professional <br />familiar with the construction industry. <br /> <br />3.2.2 A fixed limit of construction cost for this Project will be established by the City's <br />representative after consulting with the Architect. The Architect will be permitted to include <br />contingencies for design, bidding and price escalation, to determine what materials, <br />equipment, and types of construction are to be included in the construction contract <br />documents, to make reasonable adjustments in the scope of the Project and to include in <br />the construction contract documents alternate bids to adjust the construction cost to the <br />fixed limit. The fixed limit of construction cost may be increased by the City. <br /> <br />3.2.3 If the lowest bona fide bid exceeds the Architect's most recent approved cost <br />estimate established as a condition of this Agreement, the City will (1) give written approval <br />of an increase in such fixed limit, (2) authorize rebidding of the Project within a reasonable <br />time, or (3) cooperate in revising the Project scope and quality to reduce the construction <br />cost. During the development of the Project through the phases described by Article 1 of <br />this Agreement and prior to the City's final approval of construction contract documents, <br />the Architect will monitor the established probable construction cost in relation to the <br />established fixed limit. <br /> <br />If necessary, the Architect will implement construction cost savings measures or <br />otherwise endeavor to limit probable construction cost to the level of available funds set <br />by the City. <br /> <br />ARTICLE 4 <br />REIMBURSABLE EXPENSES. <br /> <br />4.1 A fixed fee of $5,800.00 is set for reimbursable expenses, including such things as <br />expenses for plotting, reproduction of documents, including up to 5 sets of design <br />documents and 30 sets of bid document, auto travel mileage, delivery charges, long <br />distance communications, freight, and state accessibility review. Reimbursable expenses <br />are to be charged to the City by the Architect at the actual cost to the Architect. <br /> <br />ARTICLE 5 <br />PAYMENTS TO THE ARCHITECT <br /> <br />5.1 PAYMENTS ON ACCOUNT OF BASIC SERVICES <br /> <br />5.1.1 Payments for Basic Services will be made to Architect monthly following receipt by <br />City of Architect's invoices and appropriate payment requisitions. The amounts of these <br />invoices will be based upon the extent of work completed by the Architect on a percentage <br />basis within each phase of services, in accordance with Article 14, less any disputed <br />amounts, pending resolution thereof. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.