1. 14.2 Assist the City in tabulating bids and preparing bid tabulation forms, including a <br />comparison to estimated costs. The Engineer will NOT attend a bid opening. <br />1.14.3 Assist the City in reviewing all bids, the Statement of Bidder's Qualifications, financial <br />statements of bidders, lists of bidders' proposed subcontractors, and all other documents required <br />to be submitted with the bids for responsiveness and for bid amount. The Engineer will verify <br />through reasonable investigation the financial and performance history documentation submitted <br />by the low bidder and second low bidder, and their references. The City will provide copies of <br />all of the bid documents to the Engineer within one day from the date of receipt of bids and the <br />Engineer will prepare a report of its review and evaluation of within ten calendar days of receipt <br />of the bid documents of the contract for construction, or other action as may be appropriate. The <br />City will make the final decision on the award of the construction contract and the acceptance or <br />rejection of bids. The Engineer will provide technical (but not legal) advice in bid protest <br />situations. <br />1.14.4 Have no authority to issue a Notice to Proceed to any Contractor. <br />Construction Contract Administration <br />1. 14.5 The Engineer will attend a pre - construction conference as a reference to answer <br />questions only. The Engineer will not schedule /invite /organize attendees to the pre - construction <br />conference, prepare the agenda, or meeting minutes for the pre - construction conference. The <br />Engineer will review and provide comment (if necessary) on the City's prepared agenda and/or <br />minutes. <br />1.14.6 Attend up to twelve (12) progress meetings with the City and Contractor during the <br />Construction Phase. The City will prepare meeting agendas and minutes for each meeting, and <br />the Engineer will provide comment (if necessary) on any City prepared meeting agendas or <br />minutes. <br />1.14.7 Perform up to twelve (12) on -site inspections of the Project during the construction <br />phase. Such visits and observations by Consultant are not intended to be exhaustive or to extend <br />to every aspect of contractor's work in progress. Observations are to be limited to spot checking, <br />selective measurement, and similar methods of general observation of the Work based on the <br />Engineer's exercise of professional judgment. Based on information obtained during such visits <br />and such observations, the Engineer will evaluate whether the contractor's work is generally <br />proceeding in accordance with the Contract Documents, and Engineer will keep the City <br />informed of the general progress of the Work. <br />1.4.8 The purpose of Engineer's site visits will be to enable the Engineer to better carry out the <br />duties and responsibilities specifically assigned in this Agreement to the Engineer, and to provide <br />the City a greater degree of confidence that the completed Work will conform in general to the <br />Contract Documents. The Engineer shall not, during such visits or as a result of such <br />observations of contractor's work in progress, supervise, direct, or have control over contractor's <br />work, nor shall have authority over or responsibility for the means, methods, techniques, <br />Kimley -Hom — FM 2439 (Hunter Road) <br />23 <br />